I will cover Portal Server project development in greater detail in Part 2 of this series.
我在本系列的第2部分将更详细地讨论PortalServer项目开发。
For example, one project development team might be catering to defects or change requests (CRs) coming in from different customers.
例如,一个项目开发团队可能要面对并处理来自不同客户的缺陷或者变更请求(CRs)。
Having an effective process assists in the initial project development, and insures that bug fixes can be deployed as quickly as the change can occur.
拥有有效的过程有助于最初的项目开发,并且可以保证随着变更的出现尽快地部署错误修补程序。
In software project development, without adequately delimiting the scope of the search we are unable to identify a meaningful set of reusable artifacts.
在软件项目开发中,如果没有适当地界定搜寻的范围,我们就无法鉴定可重新利用构件的有意义的集合。
LCD is widely used, this example program is very useful for LCD project development.
LCD应用非常广泛,本范例程序对LCD工程开发十分有用。
This is a 062 - AD0832 digital voltmeter 1602 LCD, for beginners and project development.
这是一个062- AD 0832数字电压表1602液晶,适合初学者及工程开发。
If all of them are designed and realized repeatedly, the efficiency of project development must be depressed.
对这些子系统进行重复的设计和实现显然会降低工程的开发效率。
The technology and equipment selection of fan generation electricity is the major problem of project development.
风力发电项目的技术与设备选择是项目开发的核心问题。
Be responsible for test system release according to project development process, cover the whole product life circle.
负责项目开发过程中测试系统发布,并覆盖整个产品生命周期。
Project Contents: The project includes tourism project development, management and information consultation, service.
项目内容:旅游项目开发、经营,旅游信息咨询、服务。
In this paper, research and design of EGCS is made with background of the project development for a corporation in Xiamen.
本文正是以厦门一家公司的项目开发为应用背景,对电梯群控系统进行了研究与设计。
This paper proposed the knowledge management strategy for software project development based on the theoretical research and case study.
本文通过理论研究和案例研究,提出了软件项目开发知识管理策略。
By applying the concept of real options in economics, IT project development is regarded as a process of real options change in this paper.
本文借助经济学中的实物期权思想,把IT项目开发过程视为实物期权的变更过程。
Workflow management for product design process is the core management process which influences the project development cycle and total benefit.
产品设计过程的工作流管理是产品设计的核心管理过程,直接影响着项目的开发周期和整体效益。
This paper makes research from the Angle of view of quality management in the process of aerospace project development based on product assurance.
本文研究以基于产品保证的航天型号研制的质量管理为视角。
In the development of economic house, it is very helpful to use market-especially bidding mechanisms to enhance the efficiency of project development.
在经济适用房项目开发建设中充分利用市场机制尤其是招标机制,有利于提高项目的开发建设效率。
A cost estimate at a given stage of project development represents a prediction provided by the cost engineer or estimator on the basis of available data.
在项目开发过程中的某一特定阶段的成本估算就是造价工程师在现有数据基础上对未来成本的预测。
The mismanagement problems of communication often affect the overall project development and progress, thus affecting the ultimate success of the project.
由于沟通管理不当引起的问题常常影响到整体项目的开发和进展,从而影响项目最终成功。
For the complexity of aerospace project development, its risk evaluating model was proposed on the basis of modern multiple attribute linguistic decision method.
针对航天研制项目风险管理的复杂性,提出了一种基于现代多属性语言决策方法的航天研制项目风险评价模型。
Secondly, after comparatively analyzing various risk evaluation methods, a risk decision-making model of project development based on Fuzzy Assessment was built.
接着在对比分析各类风险评价方法的基础上,构建了基于模糊综合评价的风险决策模型;
Therefore, the research on CDM project development in the field of comprehensive utilization of resources in the cement industry in China is still in its infancy.
因此,我国对水泥企业开发资源综合利用领域CDM项目的研究工作还处于起步阶段。
Verbal communication or loosely defined requirements used as a foundation for project development can lead to bad assumptions, errors, and ultimately the wrong solution.
语言沟通或作为项目开发基础的不精确定义的需求会导致不良的设想、错误及最终错误的解决方案。
Abstract: : in the process of real estate project development, cost control in different stages has different characteristics, roles as well as the important degree.
摘要:成本控制贯穿于房地产项目建设的全过程。在房地产项目开发过程中,不同阶段的成本控制有着自身的特点,所起的作用,以及重要程度存在一定的差异。
In addition, the flow of risk management in software project development is adjusted and dynamic risk management of software project is realized using BNs belief update.
同时,进一步完善了软件项目开发风险管理流程,并利用贝叶斯网络的信念更新过程实现动态软件项目风险管理。
Low security keys are often generated by software-based CSPs and exported to a file so they can be checked into source code management systems during project development.
安全性低的密钥通常由基于软件的csp生成并导出到文件,以便项目开发期间可以将它们登记到源代码管理系统中。
Low security keys are often generated by software-based CSPs and exported to a file so they can be checked into source code management systems during project development.
安全性低的密钥通常由基于软件的csp生成并导出到文件,以便项目开发期间可以将它们登记到源代码管理系统中。
应用推荐