• This paper introduced some of my ideas and proposals about the necessity to build a project cost information management system, the usage and maintenance of the system.

    本文简要介绍了工程造价管理信息系统建立必要性维护使用一些设想,提出一些个人看法和建议,希望信息系统的建立能起到抛砖引玉的作用。

    youdao

  • If the information being disclosed to management is cost only, then it would appear the project is running under budget.

    如果报告管理信息只是成本那么出现的情况项目正在按照预算进行

    youdao

  • On one project (corporate it context), we deliberately studied the cost for both installing a traceability tool, and the human labor involved in keeping the information up to date.

    一个(企业IT)项目中,我们特意研究采用工具进行跟踪,以及通过人工来跟踪信息更新成本

    youdao

  • To evaluate the cost/benefit tradeoff of our approach, which we call PBR-UP, we performed a case study in the context of a small software development project (an object-oriented information system).

    为了评估我们方法成本/收益权衡我们其为 PBR-UP,我们在软件开发项目环境案例研究(一个基于对象信息系统)。

    youdao

  • The risk register includes information such as the risk owner, cause, effect, status, probability, impact of the risk on the project cost, schedule and customer.

    风险登记簿包含信息有风险责任人成因效应状态概率、风险项目费用进度客户影响

    youdao

  • Financial database containing information such as labor hours, incurred costs, budgets, and any project cost overruns.

    财务数据库包括工时发生费用预算以及任何项目费用超支等信息

    youdao

  • This paper studied on the system analysis, design and application of water and electricity project bid management information system based on cost analysis.

    本文基于造价分析水利水电工程招标管理信息系统的系统分析、设计应用问题进行了研究

    youdao

  • The text take discuss on importance of collect and clean up and accumulate base information in road project cost management.

    针对目前公路工程造价管理工作基础资料收集整理积累工作重要性进行了论述。

    youdao

  • The project has been completed the construction cost of collection, collation and analysis of information on the cost of the division is of great reference value .

    已经完工工程项目工程造价收集整理分析资料造价具有十分重要参考价值

    youdao

  • Requirements volatility (RV) is a common information system project risk that can have severe consequences including cost and schedule overruns and at times, even cancelled projects.

    需求波动信息系统建设比较常见的风险,很可能造成进度延期、成本超支甚至项目取消

    youdao

  • However, with sufficient time in operation, the cost and quality elements of the project of Beijing Rural Mobile Information Network are not the most important ones as well.

    然而对于北京移动农网项目来说,项目时间相对充裕,费用质量上的要求并非影响项目成败的主要因素

    youdao

  • In order to fulfill the information exchange of CAM and project cost in the control process, the second step is to coding the analyzed modules based on the codes of construction quantity bill.

    第二对分解到位模块按照以工程量清单编码为基础的原则进行编码,以便控制过程中的计算机辅助管理工程造价对应信息传输。

    youdao

  • The article focuses setting forth on the influence of internal construction cost information of construction project on the management of the main construction cost with the different benefits.

    该文重点阐述了建设项目内部造价信息不同利益主体造价管理影响

    youdao

  • In other words, contractors manage the construction project on the basis of occupying the cost information.

    就是说,承包方所从事工程项目管理活动是建立在对工程成本信息把握之上的。

    youdao

  • The practice shows that, for the project, as an effective method for acquisition fundamental information in early time, this technique has shortened the operation cycle, and has saved the cost.

    实践证明此项技术作为获取项目前期基础信息有效手段作业周期、成本经济且现势性好,其成果兼具客观性和直观性,可有效辅助项目后续工作的实施。

    youdao

  • This paper discusses the management measure of engineering information, the composition in project construction and the prominent role in the project cost.

    本文主要论述工程信息管理措施工程建设中的组成以及工程造价中的显著作用

    youdao

  • Abstract: : the information technology to promote the project cost management industry computer applications in depth and diversification.

    摘要信息技术推动工程造价管理行业计算机应用深入多样化

    youdao

  • Thirdly, a concept of project construction cost system and corresponding information encoding specification is proposed, according to the different cost environment in the different regions.

    针对通信工程造价业务特征,本文提出体系造价信息概念,并提供体系信息编码行业规范建议。

    youdao

  • The advanced information networked system office facilities and cost & consultation software provide the quality that assures for the service project.

    公司配置有先进信息网络化办公设施优质精确的造价咨询软件服务项目提供有效的质量保证

    youdao

  • The advanced information networked system office facilities and cost & consultation software provide the quality that assures for the service project.

    公司配置有先进信息网络化办公设施优质精确的造价咨询软件服务项目提供有效的质量保证

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定