• What percentage of your project cost arises from avoidable rework?

    项目成本百分之几来自不可避免重做

    youdao

  • Assessing technical viability and estimating overall project cost.

    评估技术可行性并且估计全面项目成本

    youdao

  • This discovery represented a $30 million project cost avoidance for the VA. 7

    这个发现表明 VA 可以免去三千万美元项目成本

    youdao

  • The design of micro-irrigation laterals affects the project cost and irrigated quality.

    微灌管网毛管设计,直接影响工程费用灌水质量。

    youdao

  • The solution was rolled out to all 37 financial institutions within Synovus at no additional project cost.

    没有增加项目成本的情况下,解决方案Synovus旗下所有37家金融机构得到了实施。

    youdao

  • As a professional in 2008 project cost of the university graduates, I have the knowledge and the young.

    作为一名2008年工程造价专业大学应届毕业生所拥有年轻知识

    youdao

  • Finally, ways and measures to reduce the cost from the angle of construction project cost were discussed.

    文章最后增收角度降低施工项目成本途径措施进行了探讨。

    youdao

  • In assessing project cost we will have particular regard to the current downward trend in construction costs.

    评估工程造价时,我们特别考虑目前成本回落的因素。

    youdao

  • For example, a great deal of effort is put into producing valid and reliable data for software project cost estimates.

    例如大量工作用来为软件项目成本估算产生有效可靠数据

    youdao

  • These allowances are included in project cost estimates to accommodate unforeseen events and the resulting costs.

    为了应付不可预见事件由此产生的成本,通常项目成本估算中要安排一定数量的储备金

    youdao

  • Compact, easy to move, easy to install and can reduce the project cost, without the construction of pumping stations.

    结构紧凑移动方便安装简单,减少工程造价无需建造泵房

    youdao

  • Especially in the management of the project cost management in the enterprise market development on a very important role.

    特别是项目管理中的成本管理企业市场开发具有十分重要的作用。

    youdao

  • The cost control in the construction phase is the key for construction enterprises effectively control project cost control.

    施工阶段成本控制施工企业能否有效进行项目成本控制的关键

    youdao

  • The owner is interested in achieving the lowest possible overall project cost that is consistent with its investment objectives.

    业主希望尽可能少的投入实现项目目标。

    youdao

  • This paper briefly discusses the principles of project cost management and project cost, the scientific method of reducing cost control.

    本文简单论述项目成本管理原则减少项目成本、进行成本掌控科学策略

    youdao

  • For example, a metric that does not correlate to the project cost or duration cannot aid in assessing the variance reduction in the iterations.

    例如,与项目成本持续时间无关度量标准不能帮助评估迭代中的方差削减

    youdao

  • Therefore, the high-speed railway construction enterprises must carry out the project cost control in order to ensure economic efficiency.

    因此高速铁路施工企业必须进行项目成本控制才能保证经济效益

    youdao

  • Reuse of assets can in many cases lead to reduced project cost; and for proven assets, their reuse often means higher quality in new applications.

    很多情况下资产复用导致更低项目成本经过验证的资产,对它们的复用通常意味着应用程序更高质量

    youdao

  • For example, a scope change will almost always affect project cost, but the scope change may or may not affect team morale or product quality.

    例如项目范围改变几乎总会影响项目的费用并不一定影响项目团队士气或者产品质量

    youdao

  • This thesis analyzes the characteristics of all phases of project-cost management, and the corresponding countermeasures to control project cost.

    本文分析了工程造价管理各个阶段及其特点提出进行工程造价控制的相关措施。

    youdao

  • Assist in setting up the project cost follow-up report, according to the projects financial management, prepare the monthly analysis for variation.

    根据项目财务管理要求,协助部门经理建立项目成本跟踪报告按月分析,报告差异

    youdao

  • While test engineers cannot estimate total project cost, they can certainly estimate testing contribution to cost, and suggest test risks and feasibility.

    虽然测试工程师不能估算总的项目成本但是他们的确可以评估成本的测试贡献并且提出测试风险可行性

    youdao

  • They are designed to provide advisory services, project cost control, engineering and equipment, material bidding. project management consultancy services.

    服务项目提供设计咨询工程成本控制工程设备材料招投标,工程项目管理等顾问服务。

    youdao

  • Not only had the project cost far more than it was supposed to, but a city spiraling toward bankruptcy didn't exactly need millions more square feet of office space.

    不仅项目成本超过预算,而且一个螺旋式接近破产城市并不需要更多的百万平方英办公室空间

    youdao

  • This article analyses and compares the problems existing in the cost control of the early stage, and it discusses a solution to control the project cost effectively.

    本文分析比较了当前我们住宅建设前期造价控制阶段存在问题,针对这些问题提出了相应的解决方法更好、有效地控制工程造价提出了意见建议。

    youdao

  • Therefore, understanding the forced mechanism of soil anchor bolting to design competence, reduce project accident and reduce project cost has directive significance at present.

    因此了解土层锚杆受力机理目前锚杆设计水平减少工程事故降低工程造价具有指导意义

    youdao

  • Therefore, understanding the forced mechanism of soil anchor bolting to design competence, reduce project accident and reduce project cost has directive significance at present.

    因此了解土层锚杆受力机理目前锚杆设计水平减少工程事故降低工程造价具有指导意义

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定