• Assessing technical viability and estimating overall project cost.

    评估技术可行性并且估计全面的项目成本。

    youdao

  • This discovery represented a $30 million project cost avoidance for the VA. 7

    这个发现表明 VA 可以免去三千万美元的项目成本。

    youdao

  • The solution was rolled out to all 37 financial institutions within Synovus at no additional project cost.

    在没有增加项目成本的情况下,解决方案在Synovus旗下所有37家金融机构中得到了实施。

    youdao

  • For example, a great deal of effort is put into producing valid and reliable data for software project cost estimates.

    例如,大量的工作用来为软件项目成本估算产生有效和可靠的数据。

    youdao

  • For example, a metric that does not correlate to the project cost or duration cannot aid in assessing the variance reduction in the iterations.

    例如,与项目成本或持续时间无关的度量标准不能帮助评估迭代中的方差削减。

    youdao

  • The design of micro-irrigation laterals affects the project cost and irrigated quality.

    微灌管网毛管的设计,直接影响到工程费用和灌水质量。

    youdao

  • In the last part, the paper summarizes and studies the cost and fee of project cost consultation.

    在成本与费用估计部分,对工程造价咨询项目涉及的成本与费用进行了总结和研究。

    youdao

  • In order to improve establishment level of project cost, the present pricing mode must be changed.

    提高工程造价编制水平,必须改变现有的计价模式。

    youdao

  • It is a good method to perfect construction bidding market, to strengthen the project cost system.

    是完善建筑工程招标投标市场,健全造价市场机制的有效途径。

    youdao

  • It is the key segment to estimate the unit project cost fast and correctly in project feasibility study.

    快速而正确地测算单项工程造价是项目可行性研究的关键环节。

    youdao

  • In assessing project cost we will have particular regard to the current downward trend in construction costs.

    在评估工程造价时,我们亦会特别考虑到目前成本回落的因素。

    youdao

  • With the increasing of municipal construction projects, project cost control has become more and more important.

    随着市政工程建设项目日渐增多,工程成本控制越发显得重要。

    youdao

  • These allowances are included in project cost estimates to accommodate unforeseen events and the resulting costs.

    为了应付不可预见事件和由此产生的成本,通常在项目成本估算中要安排一定数量的储备金。

    youdao

  • Compact, easy to move, easy to install and can reduce the project cost, without the construction of pumping stations.

    结构紧凑,移动方便,安装简单,可减少工程造价,无需建造泵房。

    youdao

  • Financial database containing information such as labor hours, incurred costs, budgets, and any project cost overruns.

    财务数据库,包括如工时、发生的费用、预算以及任何项目费用超支等信息。

    youdao

  • Applying the project management, Strengthening the project cost accounting, Improving the enterprise economic benefit.

    实施项目法管理,加强项目成本核算,提高企业经济效益。

    youdao

  • Therefore, selecting proper rock ash content is an important measure to improve concrete quality and lower project cost.

    因此选用合适的石粉含量是提高混凝土施工质量、降低工程造价的一项不可忽视的重要措施。

    youdao

  • Warm mix asphalt also has reduced the project cost, with the advantages of extending the service life of asphalt pavement.

    温拌沥青混合料还具有降低工程成本,延长沥青路面使用寿命的优势。

    youdao

  • Therefore, the rapid estimation of project cost construction has become an important management and decision support content.

    所以,工程造价的快速估算问题已成为工程建设管理及辅助决策的重要内容。

    youdao

  • The owner is interested in achieving the lowest possible overall project cost that is consistent with its investment objectives.

    业主总希望以尽可能少的投入来实现项目的目标。

    youdao

  • According to the construction cost plan, cost program evaluation and time-cost optimization are used to control the project cost.

    根据施工项目的成本计划,运用成本计划评审法和时间成本优化法对项目成本进行控制。

    youdao

  • The article concludes that the project cost management is a dynamic course, and influenced by the market and other uncertain factors.

    文章的结论是,工程成本管理是一个动态的过程,受市场因素及其它不确定性因素的影响。

    youdao

  • The project cost management model that we're applying now is Whole Process Cost Management model using the ration as the pricing basis.

    我国目前采用的工程造价模式是以定额为计价基础的全过程造价管理模式。

    youdao

  • The case study indicates that the method proposed in this article can effectively plan and control project cost and schedule objectives.

    实例研究表明,本文提出的方法可更好地计划和控制项目的费用及进度目标。

    youdao

  • When pricing based on bill of quantities, the project cost consists of sub-engineering fee, measure fee, other fee, regulate fee and tax.

    在工程量清单计价模式下工程造价由分部分项工程费、措施项目费、其他项目费、规费和税金等构成。

    youdao

  • It proves that construction schedule, quality and safety goals can be reached with DOKA formwork system, and project cost can be reduced.

    实践证明,DOKA大模板系统可保证施工进度、质量、安全,并可节约成本。

    youdao

  • Therefore, the high-speed railway construction enterprises must carry out the project cost control in order to ensure economic efficiency.

    因此,高速铁路施工企业必须进行项目成本控制,才能保证经济效益。

    youdao

  • Reuse of assets can in many cases lead to reduced project cost; and for proven assets, their reuse often means higher quality in new applications.

    在很多情况下资产的复用导致更低的项目成本;而对经过验证的资产,对它们的复用通常意味着新应用程序的更高质量。

    youdao

  • For example, a scope change will almost always affect project cost, but the scope change may or may not affect team morale or product quality.

    例如,项目范围的改变几乎总会影响项目的费用,但并不一定会影响项目团队的士气或者产品的质量。

    youdao

  • This thesis analyzes the characteristics of all phases of project-cost management, and the corresponding countermeasures to control project cost.

    本文分析了工程造价管理的各个阶段及其特点并提出进行工程造价控制的相关措施。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定