Figure 2 shows the project content before you add the dojo Toolkit (note that there is no dojo folder).
图2显示了添加dojoToolkit之前的项目内容(注意尚没有dojo文件夹)。
I. project content, construction scale and location: This project lies in Gongye South Road, Long 'an Industrial Projects Zone. It will occupy a land of 200 mu.
项目内容、建设规模及选址:龙安工业项目区工业南路,建设占地面积200亩。
The development of BF expert system in China is analyzed. To promote the application of BF expert system, the project content, method and application process should be improved.
通过对我国高炉专家系统开发现状的分析,认为在高炉专家系统的开发内容、开发手段以及使用上应进行必要的改进,这样才能促进高炉专家系统的推广应用。
Modify project content in the workbench as Programmer 1.
作为开发者1,在平台下修改工程的内容。
The Project Content: Construct26 production lines and the matching establishments.
项目内容:建26条生产线及配套设施。
The Project Content : The 300-mu foundation land is used for studying and developing the gypsum construction products.
项目内容:新征土地300亩,进行新型石膏建材研发。
Project content : The Project use the wheat Straw to the raw material to produce light quantity and environment protection particle board .
项目内容:本项目以小麦秸秆为主要原料,生产轻质、环保型刨花板。
Project Content: Set Equipment Manufacturing project in the industrial park which concludes: machine tool, mold, measuring implement, instrument and component.
项目内容:在园区内建设装备制造项目,主要为机床、工具、模具、量具、仪器仪表、元器件等产品。
Project Content: the place locates on south east Angle of the cross of Guangming west road and west ring road. The total area fo the place is about 8 hectares.
项目内容:该地块位于光明西道与西环路交叉口东南角,地块占地面积约8公顷。
Project Content: the place locates on south east Angle of the cross of Guangming west road and west ring road. The total area fo the place is about 8 hectares.
项目内容:该地块位于光明西道与西环路交叉口东南角,地块占地面积约8公顷。
应用推荐