• If you go back to Construction Industry Institute studies, most will indicate that the owner is the biggest factor in project success.

    假如你溯查建筑行业学会的研究,绝大多数会指出业主是工程成功与否的最大原因。

    youdao

  • During construction, the accuracy of construction lofting is an decisive factor for the quality of the whole project.

    在施工中,施工放样的准确性对整个工程的质量起着关键性作用。

    youdao

  • Fifth chapter introduced the local railway construction project uncertainty factor analysis and the synthetical evaluation.

    第五章介绍了地方铁路建设项目不确定因素分析及综合评价。

    youdao

  • We use factor analysis method to evaluate partner building safety in the setting of virtual enterprise of construction project.

    应用因子分析法对建设项目动态联盟背景下的伙伴施工安全进行评价。

    youdao

  • Project pre-feasibility analysis, a crucial part of bridge and tunnel preparatory work construction, often becomes a controlling factor of a project.

    工程预可行性分析是桥梁和隧道建设前期工作的重点组成部分,往往成为项目立项的控制性因素。

    youdao

  • The geological work of mountain expressway is a pivotal factor which influences the construction course and the project′s quality.

    山区高速公路的地质问题是决定施工进程和工程质量的关键因素。

    youdao

  • For land leveling of any construction project, compacting factor is not an easy thing to be determined.

    在对建设项目的场地平整中,压实系数值的确定实属一件不易之事。

    youdao

  • This paper is to discuss the project selection, construction method, technical specification and quality control of soil nailing and analyze the special factor in detail.

    简述了土钉墙支护技术的方案选择、施工工艺、技术要求及质量控制,并就具体实例做了详细分析。

    youdao

  • Cost control of construction project, which is regarded by the construction enterprise manager, is the key factor to decide whether the project successful or not.

    工程项目的成本控制,是建筑企业管理中的热点问题,是决定项目能否成功的关键因素。

    youdao

  • According to the problems above, this paper analyzes the uncertain factor of the project, fully studies the practical problems of the fuzzy Network planning's using in construction.

    针对上述问题本文通过对项目实施过程中不确定因素的分析,全面地研究了模糊网络计划在工程施工中的应用问题。

    youdao

  • Considering the large work quantity and tight time schedule for the curtain grouting in Bid I of Letan project, drilling speed is the most critical factor in the construction progress.

    乐滩水电站I标工程帷幕灌浆工程量大,工期紧,影响施工速度的最大因素是钻孔速度。

    youdao

  • Considering the large work quantity and tight time schedule for the curtain grouting in Bid I of Letan project, drilling speed is the most critical factor in the construction progress.

    乐滩水电站I标工程帷幕灌浆工程量大,工期紧,影响施工速度的最大因素是钻孔速度。