As a project is initiated, your project lead can configure the base process framework using RUP Builder and process plug-ins that are relevant for your project.
当项目启动时,您的项目领导会利用RUPBuilder和与您项目相关的流程插件配置基础流程框架。
Management of requirement and its change is the base of the whole developing process of information system project and one of the critical success factors of the project.
需求及其变更管理是整个信息系统工程开发过程的基础,也是项目成功的关键因素之一。
The genuine training base has the following five features such as genuine environment, genuine infrastructure, genuine project, genuine process and genuine product.
“全真型”实训基地具有真实的环境、真实的设施、真实的项目、真实的流程和真实的产品“五真”特点。
The paper takes research for bearing base pile in Xi 'an loess region about project application, and introduces the process about design, construction and supervision of bearing base pile.
结合西安黄土地区载体桩工程实例,介绍了载体桩的设计、施工及质量检测过程。
Moreover, the thesis discusses project process quality evaluation system and implementary methods which both base on the process capability.
进而,探讨了基于过程能力的项目过程质量测评体系及实施方法。
This paper explains status quo of project of constructing Chinese FrameNet (CFN) and approach and process of CFN automatic tagging and knowledge base of face Chinese question and answer.
本文介绍了汉语框架语义网(CFN)构建现状,并详细的论述了CFN自动标注方法和构建面向中文问答处理知识库的探索过程。
Successful software project must base on a good software process meta model and a corresponding support environment.
成功实施的软件项目必须基于一个良好的软件过程元模型与相应的软件过程支撑环境。
Then the planning process breaks the project into an operating unit and begins using the assumption sheets as the base planning point to plan the operating venue.
通过规划我们将一个项目分解为各个可操作的单元,然后以“假想表格”作为基本的规划方法来进行现场实施规划。
Then the planning process breaks the project into an operating unit and begins using the assumption sheets as the base planning point to plan the operating venue.
通过规划我们将一个项目分解为各个可操作的单元,然后以“假想表格”作为基本的规划方法来进行现场实施规划。
应用推荐