• After verification, the programme to achieve the basic project management processes, standardization and institutionalization, and ensure high-quality projects completed on time.

    经过验证,该方案基本实现工程管理的流程化、规范化、制度化,保证各个项目按时高质量的完成。

    youdao

  • Project Management: Audit Implementation Programme, Regulatory implementation of the project to Ensure good operation;

    项目管理:审核执行方案及排期,监管项目的执行情况、流程进度和成本控制,确保良好运行;

    youdao

  • Wave 2 will introduce and integrate strategic management functions such as budgeting, results-based management, risk management, resource mobilization, programme management and project management.

    第2波将引进和整合各种战略管理功能,例如预算编制、成果管理制、风险管理、资源调动、方案管理和项目管理。

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计了长周期(18个月)低泄漏平衡循环堆芯,为秦山二期扩建工程制定了一套具有工程实用价值的燃料管理方案。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定