• After verification, the programme to achieve the basic project management processes, standardization and institutionalization, and ensure high-quality projects completed on time.

    经过验证方案基本实现工程管理的流程化、规范化制度化保证各个项目按时高质量完成

    youdao

  • Wave 2 will introduce and integrate strategic management functions such as budgeting, results-based management, risk management, resource mobilization, programme management and project management.

    第2引进整合各种战略管理功能例如预算编制、成果管理制风险管理、资源调动方案管理和项目管理。

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值燃料管理方案

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值燃料管理方案

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定