• The master production scheduling(MPS) problem of hot rolling seamless steel tube is formulated as a mixed integer linear programming model.

    建立了热轧无缝钢管生产计划问题混合整数线性规划模型

    youdao

  • The batch on-line scheduling problem is presented from the production of iron and steel plant, which is a main part of MES in process industry.

    钢铁生产热轧流程中提炼出了同构并行机上在线调度问题流程工业MES重要环节

    youdao

  • To solve the problem of resource allocation in the multi-Agent-based agile production scheduling, combinatorial auction based negotiation policy was proposed.

    为了解决基于智能敏捷生产调度资源分配协商策略问题,提出了实现组合拍卖的协商策略的解决方法。

    youdao

  • But in the real production scheduling process, faced with complex processing environment and resource constraints, we need to design a effective algorithm to solve the scheduling problem.

    然而现实生产调度过程中面临复杂加工环境资源约束需要设计出一种有效地算法解决生产调度问题。

    youdao

  • A kind of problem of simultaneously optimizing batch splitting and scheduling for parallel production lines was discussed.

    研究一类并行生产线上生产调度批量分割同时优化问题

    youdao

  • Applying rough sets theory to production scheduling solves the difficult problem of rules discovery for production scheduling through the successful schedule rules found in history data.

    把变精度应用于生产调度中,历史调度数据中发现成功调度规则解决了生产调度中的规则获取难题

    youdao

  • A new multiqueue method with variable priority is presented to solve the real time dynamic scheduling problem of automatic transportation system in flexible electrophoresis production line.

    提出可变优先级多重任务队列方法解决电泳柔性生产线自动输送系统实时动态调度问题

    youdao

  • A solution framework is proposed for the problem of synchronized scheduling of production and air transportation in supply chain.

    提出解决供应链生产航空运输协调调度问题理论框架

    youdao

  • A hybrid flow shop scheduling problem with no-wait is derived from the optimal matching of furnaces and machines in steel making casting production.

    炼钢连铸生产计划优化匹配问题归结为个不允许等待混合流水车间排序问题来进行研究,提出了一个启发式算法-最小偏差算法。

    youdao

  • The scheduling problem of finite intermediate storage is considered for some unstable materiel in multi-production batch process.

    针对某些不稳定中间产品,考虑中间储罐存储时间有限调度问题

    youdao

  • The scheduling problem of finite intermediate storage is considered for some unstable materiel in multi-production batch process.

    针对某些不稳定中间产品,考虑中间储罐存储时间有限调度问题

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定