The production casing cementing problems in Tahe Oilfield in 1998 are analyzed, and the main reasons causing low cementing quality are found.
针对塔河油田1 998年生产套管固井质量存在的问题进行了分析,找出了影响固井质量的主要因素。
A completion configuration in which a production casing string is set across the reservoir interval and perforated to allow communication between the formation and wellbore.
一种完井结构,其中的生产套管柱下过储层层段并经射孔,以便在地层与井筒之间能够连通。
A completion configuration in which a production casing string is set across the reservoir interval and perforated to allow communication between the formation and wellbore.
一种完井结构,其中的生产套管柱下过储层层段并经射孔,以便在地层与井筒之间能够连通。
应用推荐