Creating the Transformer cubes is a simple process that is based on the selected option boxes located in the Reports section.
Transformercubes的创建是一个简单流程,基于Reports部分中的选项框的选择情况。
This matching makes the process of transfer far less wasteful than it is with a traditional transformer-based adaptor.
比起传统的基于变压器制造的适配器,按需电量调节的充电法大大降低了不必要的浪费。
The formulation design, processing characteristic and material choice of winding without filling in epoxy resin cast dry-type transformer are introduced. The warnings in cast process are presented.
介绍了环氧树脂浇注干式变压器无填料绕组浇注的工艺特点、材料的选择和配方设计,提出了浇注过程中应注意的事项。
This method will push the aggregation and calculation operations to the database rather than having Transformer process them.
这个方法将会把汇总和计算操作保存到数据库中,而不是将它交给Transformer处理。
For example, measure aggregation and calculations can be passed to the database layer for processing rather than having Transformer process them.
例如,度量指标汇总和计算可以传递到数据库层进行处理,而不是在Transformer中处理。
Welding principle and its operating process of flat copper wire in large transformer windings are introduced.
介绍了大型变压器绕组用扁铜导线的焊接原理及其操作工艺。
In this paper, 10kv distribution transformer selection and installation process is simply discussed.
本文就10KV配电变压器选择与安装工艺进行了简单论述。
On basis of LR circuit transition process analysis, the paper describes measuring method of zero time factor for transformer wire-wound resistor with specific exciting supply.
本文在分析LR电路过渡过程的基础上,讨论了以特定激励源实现变压器绕组电阻零时间常数测量的方法。
A moisture measuring system, including the sensor, can be applied in measuring moisture in pressboard of transformer coils during the drying process.
由它构成的微水份测量系统,可以用于现场干燥过程中的变压器绝缘纸板微水份检测。
The on-site drying method by using hot oil circulation and hot oil spray, its process and the operation result for large transformer are introduced.
介绍了采用热油循环及热油喷淋法现场干燥大型变压器的方法、过程和运行效果。
The wave process of transformer winding under impulse voltage is introduced. The software for winding wave process calculation is presented.
介绍了变压器在冲击电压下的绕组波过程及绕组波过程的计算软件。
Based on single column process of packed poromeric chromatographic column, the chromatographic analysis process of transformer oil with SP3430 gas chromatographic apparatus has been improved.
采用填充多孔高聚物色谱柱单柱流程对SP3430气相色谱仪的变压器油色谱分析流程进行了改进。
This paper analysis reason of bring gas of C2H2 on the purifying process of transformer oil time and time, then brings some methods to treatment.
针对变压器油净化处理过程中多次产生乙炔(C2H2),分析原因并提出相应的防范措施。
Based on the design process of linear variable differential transformer (LVDT), the expert design system of LVDT is put forward.
在分析差动变压器式位移传感器整个设计流程的基础上,提出开发位移传感器专家设计系统。
Nameplate rating is only a guide to transformer application, and should only be used as a first step in the selection process.
铭牌额定值仅是变压器应用的一个指导,只是选择过程的第一步。
In the process of developing submarine cable laying installation for Shengli Oil Field, a certain problem has occurred with overcurrent tripping during switching on of step up transformer.
在为胜利油田研制海底电缆铺设装置过程中,曾发生升压变压器合闸时过电流跳闸问题。
This paper introduces the principle and characteristic of the air-core coil current transformer, designs AC-sampling and processing circuit, and introduces the process of software detail.
介绍了空心线圈电流互感器的工作原理和特点,设计了适于此种互感器的交流采样和处理电路,详细介绍了软件的处理过程。
The supply power degree of transformer must be carefully selected in the melting process of electric furnace, so that it is reasonable to supply power.
电炉冶炼过程中,应慎选变压器供电档位,以达到合理供电的目的。
Transformer economical life is relative and dynamic, and considers all factors which affect transformer economical operation in assessment process.
该经济寿命具有相对性、动态性,并且在评估过程中考虑了影响变压器经济运行的各方面因素。
In the process level, issues such as communication protocol selection, tripping manner selection, electronic transformer installation are discussed.
在过程层,对通信规约的选择、跳闸方式的选择、电子互感器安装等方面的问题进行了讨论。
To calculate self and mutual inductance of coreless transformer in printed circuit board, The author offered a new method to calculate based on Neumann equation as well as testing process and circuit.
为了计算印制版空芯变压器的自感和互感,提出一个以纽曼公式为基础的新的计算方法,并给出了测试方法和测试电路。
This article describes some characteristics of ABB transformer and applications in the steel-making process.
本文主要介绍ABB变压器的特点及在炼钢工艺中的应用。
The Tapping switch damaged of a main transformer which power is 370MVA was analyzed, the handling process the measure of preventing accident were provided.
对一起370MVA主变压器分接开关损坏的原因进行了分析,介绍了处理经过,提出了反事故技术措施。
The proposed method was verified by a simple model, which has analytical solutions, and used to analyze the pr process of a typical oil-paper insulation structure of converter transformer.
通过一个有解析解的双层有损同轴绝缘结构模型,验证了方法的有效性。最后,分析了一个换流变压器阀侧绕组典型绝缘结构的极性反转电场变化过程。
Applied transformer in the steelmaking process is a good solution of the implementation of energy efficiency.
将先进的电炉变压器用到炼钢工艺中,是实现增效节能的很好解决方案。
In common hard switching circuit, high voltage spike usually could be produced during switch transition process because of the effect of transformer leakage inductance and parasitic capacitor.
在常规的硬开关电路中,由于变压器漏感及寄生电容的影响,常常在开关转换瞬间会产生很高的电压尖峰。
This paper introduced the transformer control cabinet designed by the authors, in order to let others well know the theory of operation, performance, manufacturing process, reliability.
介绍了自行开发研制的电力变压器控制箱,有助于进一步了解变压器配套控制箱的工作原理、性能、作用及可靠性。
This paper introduced the transformer control cabinet designed by the authors, in order to let others well know the theory of operation, performance, manufacturing process, reliability.
介绍了自行开发研制的电力变压器控制箱,有助于进一步了解变压器配套控制箱的工作原理、性能、作用及可靠性。
应用推荐