Analysis of flood release capacity of upstream detention areas and the probable maximum flood reveals that the risk of levee-breach in Harbin city still exists.
对哈尔滨上游蓄滞洪区的分洪能力以及可能发生的最大洪水进行了计算和分析,得出的结论认为哈尔滨市未来仍有发生溃堤的可能。
Analysis of flood release capacity of upstream detention areas and the probable maximum flood reveals that the risk of levee-breach in Harbin city still exists.
对哈尔滨上游蓄滞洪区的分洪能力以及可能发生的最大洪水进行了计算和分析,得出的结论认为哈尔滨市未来仍有发生溃堤的可能。
应用推荐