Based on tests of two full-scale double-span prestressed frames, internal force redistribution of frame was studied and continuity of structures and axial compression ratio of column were analyzed.
基于两榀接近足尺的后张有粘结预应力混凝土框架的试验,对多跨预应力框架的内力重分布进行了研究,重点考虑了框架的连续性和轴压比的影响。
A new kind of reinforced concrete (including prestressed concrete) frame structure with diagonal member is put forward.
提出了一种带腋撑的新型钢筋混凝土(含预应力混凝土)框架结构。
Based on the theory and test, the aseismatic behaviour of the joints in the middle level of unbonded prestressed concrete flat beam frame is analyzed and discussed in this paper.
本文试图在理论研究和试验分析的基础上,分析探讨中间层无粘结预应力混凝土扁梁框架节点的抗震性能。
This paper introduces the prestressed concrete frame beams of the design process and related structural measures.
介绍了预应力混凝土框架梁的设计过程及相关构造措施。
The unbonded prestressed concrete flat beam frame can meet the aseismic requirement.
无粘结预应力混凝土扁梁框架应当可以满足抗震要求。
The shaking table test was conducted to gain an insight into the earthquake resistant performance of a large-span prestressed concrete grillage girder space frame structure.
利用地震振动台对大跨预应力混凝土井式梁空间框架结构的抗震性能进行了实验研究。
Based on the force behavior of joist of large-span prestressed space frame system, space finite element analysis of prestressed beam-slab system is carried out by using ANSYS software.
针对大跨度预应力空间框架体系托梁受力复杂的特点,采用ANSYS软件进行了预应力梁板体系的空间有限元分析。
The shaking table test has thus been conducted of a large-span prestressed concrete grillage girder frame structure to gain an insight into its earthquake-resistant performance.
利用模拟地震振动台对这种大跨预应力井式梁框架结构的抗震性能进行了研究。
That high slope is comprehensively treated by the frame of prestressed anchor stay and reinforced concrete can stop not only deep slide, but also partial surface collapse.
采用预应力锚索结合钢筋混凝土框架结构对高边坡进行综合治理,它不仅可以防止坡体的深层滑动,且完全可消除坡面的局部浅层坍塌。
The differences between unbonded prestressed concrete flat-beam frame and bonded prestressed concrete flat-beam frame in seismic response are not obvious.
在地震荷载作用下,无粘结预应力混凝土扁梁框架和有粘结预应力混凝土扁梁框架结构的各种响应没有明显的差异。
The bonded prestressed concrete structural wide flat beams were employed as the frame beams, while the unbonded prestressed concrete structure was applied to the junior beams.
框架梁为有粘结预应力混凝土宽扁梁,次梁采用无粘结预应力混凝土结构。
It is one of the defects that cracks occur in the bottom slab of an extra-long prestressed concrete continuous rigid frame bridge. There are many influence factors.
大跨度预应力混凝土连续刚构桥底板出现开裂是该类桥梁出现的问题之一,其影响因素较多。
These render a beneficial reference to evaluate the anti-earthquake performance of large-span prestressed concrete frame structures.
这些为评价大跨预应力混凝土框架结构的竖向抗震能力提供了有益的参考。
The influence of concrete creep on bridge structure under the construction and operation stage for prestressed concrete continuous rigid frame bridge and cable-stayed bridge is also analyzed.
本文还针对预应力混凝土连续刚构桥和斜拉桥,分析计算了其在施工和运营阶段,混凝士徐变对桥梁结构的影响。
It is not building, but, assembling the prestressed beams or prefabricated moulds, floor by floor. Fabrication does not come into the time frame.
那不是建设,而是一层一层组装预应力梁构件和预制造模块的过程。预制造的时间并没有算在建设工期内。
A new layout of prestressed cables in concrete frame spandrel beams is present.
提出一种混凝土框架边梁预应力筋的新束型。
By a actual engineering example in Leikou bridge, the design of prestressed concrete T-frame bridge hanging a beam.
通过磊口大桥工程实例,对带挂梁的预应力混凝土T型刚构桥的设计进行总结。
And during the cantilever construction of the prestressed concrete continuous rigid frame bridge, the beam axis shape of formed blocks can't be regulated during the subsequent constructions.
而且,在预应力混凝土连续刚构桥悬臂施工过程中,已建成梁段的线形在后期施工中是不可调整的。
The unsymmetrical construction loads is dangerous to the stability of long-span prestressed concrete rigid-frame bridge during cantilever construction phase.
非对称形式的施工荷载对悬臂施工阶段大跨径预应力混凝土刚构桥的稳定性更为不利。
Optimizing a prestressed concrete T-frame beam, selecting reasonable effective height of section and prestressed steel area can improve the beam's performance and reduce the cost.
对预应力混凝土T梁进行优化设计,选取合理的截面有效高度及预应力筋截面面积,可以提高梁的承载能力,降低工程造价。
The prestressed fabricated connection has enough displacement restoring capacity, which reduces the frame damage in earthquake and can be repaired conveniently.
预应力的作用使得试件有很强的变形恢复能力,有利于震后修复。
To ensure the quality and security of the prestressed concrete continuous rigid frame bridge, construction control was of great importance.
为了保证大跨径连续刚构桥悬臂施工的质量和安全,施工控制是非常重要的。
The prestressed continuous rigid frame bridge due to the force and deformation of the structure is very complicated.
由于预应力连续刚构桥结构受力和变形情况十分复杂。
By test, we will know more about prestressed concrete semi-rigid frame continuous box girder bridge.
通过试验,使我们对于预应力混凝土半刚构-连续梁桥有了进一步的认识。
The prestressed concrete continuous rigid frame bridge often adopts the economical and reasonable segmental construction technique with cantilever installation.
预应力混凝土连续刚构桥常常采用经济合理、方便快捷的悬臂现浇施工法。
An application of prestressed skew steel brace used in the reinforcement of concrete frame structures is introduced with an instance of a steelworks' reinforcement project.
结合某钢厂烧结厂房的加固,介绍预加应力钢斜撑在混凝土框架结构加固中的应用。
The thesis studies and analyzes parameter design of long span prestressed concrete continuous rigid-frame bridge.
本文对大跨径预应力连续刚构桥的设计参数进行了分析研究。
The moment modulation of prestressed concrete frame has some differences compared with that of continuous beam.
关于预应力结构的内力重分布研究很多是关于连续梁结构的,对预应力框架的研究相对较少。
The moment modulation of prestressed concrete frame has some differences compared with that of continuous beam.
关于预应力结构的内力重分布研究很多是关于连续梁结构的,对预应力框架的研究相对较少。
应用推荐