• During the pressure test, BP engineers are continuing to monitor the well with seismic, sonar and other equipment.

    英国石油公司的工程人员在压力测试过程中,正继续用地震检波器、声纳探察仪等设备来监看油井状况。

    youdao

  • The pressure test of process piping system on a platform is a necessary important procedure during platform construction.

    海洋平台工艺管线系统的压力试验,是平台建造中配管专业必不可少的一道重要工序。

    youdao

  • The casing pump includes the pressure test device, speed reducer and sealing cup.

    套管泵由压力检测装置、减速装置和密封皮碗等组成。

    youdao

  • By doing these simple things, you should pass your blood pressure test with flying colors!

    能做到这些简单而又容易做到的事情,你的血压检测就会顺利通过。

    youdao

  • The micropump performance test includes outlet accumulated flow rate and back pressure test.

    其中微泵的性能测试包括出口流量和背压测试。

    youdao

  • In the last part of the paper, functional test and pressure test of IPPBX is presented with results.

    最后,本文对IPPBX的功能测试和压力测试等进行了说明。

    youdao

  • It adopts the 6-section rotary table, the PLC touchscreen control and the special pressure test tester.

    采用六工位旋转工作台,PLC和触摸屏控制,专用耐压测试检测仪。

    youdao

  • A container leakage is caused by circle welding seam fractures in the course of hydraulic pressure test.

    一贮箱在水压试验时环焊缝开裂导致泄漏。

    youdao

  • Preparations for a key pressure test of the blown-out Gulf of Mexico oil well are under way, BP has said.

    英国石油公司发言人称,公司正在准备对墨西哥湾泄露油井进行一次关键性气压试验。

    youdao

  • Once the piping system passes the pressure test, sweeping shall be carried out prior to the gas leakage test.

    管道系统压力试验之后,气体泄漏性试验之前,应进行系统吹扫。

    youdao

  • The inspection indexes of the condensers were qualified in a water pressure test of tube side and shell side.

    该设备通过管壳程水压试验,各项检验合格,制造取得成功。

    youdao

  • A 2-stage turbine helium circulator is used in the high pressure test helium loop in INET, TsinghuaUniversity.

    介绍了用于高压氦气试验回路的二级涡轮式氦气循环风机。

    youdao

  • Watts offers a pressure test gauge, model 276h300 to assist you in determining if you have high water pressure.

    美国瓦茨提供压力测试表,型号276h300,帮助用户确定是否存在高水压。

    youdao

  • This paper is a discussion of the design of the sealed pressure test positioner utilizing heat exchanging pipe ends.

    本文讨论利用换热管端面进行密封的试压胎具的设计。

    youdao

  • After a new installation or maintenance for hydrogen system, pressure test, flushing and gastight test must be done.

    新安装或大修后的氢气系统必须做耐压试验、清洗和气密性试验,符合有关的检验要求,才能投入使用。

    youdao

  • Pressure Vessels used Special steel products production, And the X-ray flaw detection with advanced high-pressure test.

    压力容器采用特种钢制作,并经先进的X光探伤与高压测试。

    youdao

  • The value of stress under air pressure test shall not exceed 80% of the yield point of the material in test temperature;

    气体压力试验时的应力值,不得超过试验温度下材料屈服点的80%。

    youdao

  • Using high pressure oxygen cylinder as supercharging device, pressure test of autopolymerizing acrylic resin was carried out.

    采用自行设计的高压氧气加压法测定了自凝树脂的耐水压性能。

    youdao

  • The value of stress under hydraulic pressure test shall not exceed 90% of the yield point of the material in test temperature;

    液体压力试验时的应力值,不得超过试验温度下材料屈服点的90%;

    youdao

  • During the air pressure test, the test temperature shall be higher than the brittle transition temperature of the metal material.

    气体压力的试验时,试验温度必须高于金属材料的脆性转变温度。

    youdao

  • BP pumped cement for seven hours on Friday and finished a pressure test early on Sunday that showed the well was permanently clogged.

    英国石油公司于周五浇注了7个小时的水泥,周日早些时候完成了压力测试,结果显示油井被永久封死。

    youdao

  • Water supply for pressure test is taken from construction water for temporary purpose and set temporary water use sites in every floor.

    试压水源为工程临时用水水源,利用每层临设用水点。

    youdao

  • The basis of static pressure test for vessels under external pressure and vacuum vessels being done with internal pressure is elaborated.

    阐述了对外压容器和真空容器以内压进行压力试验的理论依据和合理性。

    youdao

  • Seal the blind plate and check carefully whether the pipeline is correctly connected and block phenomenon in the pipe before pressure test.

    试压前要先封好盲板,认真检查管路是否连接正确,有无管内堵死现象。

    youdao

  • Valve with the valve sealing surface through precision grinding, assembly, after 100% completion of pressure test, all to achieve zero leakage.

    阀瓣与阀体密封面经过精密研磨,组装完毕经过100%试压,全部达到零泄漏。

    youdao

  • Valve with the valve sealing surface through precision grinding, assembly, after 100% completion of pressure test, all to achieve zero leakage.

    阀瓣与阀体密封面经过精密研磨,组装完毕经过100%试压,全部达到零泄漏。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定