After accomplishment of the construction of cutoff wall, water pressure tests and quality inspection were conducted, and the results indicate that the dam meets the anti-seepage request.
防渗墙施工结束后,进行压水试验和质量检查,满足主坝防渗要求。
Abstract ObjectiveTo analyze differences of blood pressure, blood fat and BMI among different cutoff values of impaired fasting glucose.
【摘要】目的分析不同空腹血糖受损切点的体检人群之间的血压血脂及体重指数的差异。
Abstract ObjectiveTo analyze differences of blood pressure, blood fat and BMI among different cutoff values of impaired fasting glucose.
【摘要】目的分析不同空腹血糖受损切点的体检人群之间的血压血脂及体重指数的差异。
应用推荐