• In order to carry out power transient tests for PWR fuel element in China Advanced research Reactor (carr), the research and conceptual design of 3he pressure control loop were completed.

    为使中国先进研究堆(CARR)具备开展压水堆燃料瞬态试验的能力,本工作对氦- 3回路进行研究与初步设计。

    youdao

  • In order to carry out power transient tests for PWR fuel element in China Advanced research Reactor (carr), the research and conceptual design of 3he pressure control loop were completed.

    为使中国先进研究堆(CARR)具备开展压水堆燃料瞬态试验的能力,本工作对氦- 3回路进行研究与初步设计。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定