This dissertation works on the pre-theoretical research and technical exploration with SINS /GPS embedded integrated navigation system, which based on the pseudo-range and pseudo-range rate.
本文针对基于伪距、伪距率的SINS/GPS嵌入式组合导航系统,开展了前期理论研究和技术探索。
Based on pre-tighten moment in the process of assembly, the analytical model of the main reduce is established through theoretical analysis of the connection between screwed moment and axle force.
基于装配过程中预紧需要的预紧力矩,通过理论分析获得拧紧力矩和轴向力的关系,建立了主减速器总成装配中的力学模型。
However, the theoretical research is still sometimes ignored, neglected and even antagonized in the pre-school education academia.
然而在学前教育学术界,还存在忽视、轻视甚至敌视理论研究的情况。
This makes the evaluation of mine safety to be established on a rational theoretical basis, in which the relative risk index could be adopted directly as the pre-warning index of mine risk.
使矿山的安全评价建立在合理风险理论的基础之上,其中相对险度指标可直接作为风险预警指标使用。
This research provides a theoretical support for China's pre-merger notification mechanism.
本文的研究为中国当前的并购申报机制提供了理论支持。
It shows from theoretical analysis and experimental study that pre-damage represents an important orientation for energy-saving in rock pulverizing.
通过理论分析和试验研究表明,预损伤是粉碎节能的重要方向。
Through engineering practice and theoretical analysis, the key points of quality and safe control in bonded post-tensioned pre-stressed concrete construction was presented in this paper.
本文通过工程和理论总结概述了后张有粘结预应力混凝土施工中质量与安全控制的要点。
It has important theoretical value to scientific research and the research on history of science during Pre-Qin Dynasty.
这些对于当今科学研究暨中国先秦科学史研究都具有相当重要的理论意义和借鉴作用。
Pile foundation is widely used in construction in Shanghai region, but the site test data on bearing capacity of pre-cast concrete pile based on cohesive soil were lower than theoretical level.
上海地区建筑工程普遍采用桩基,但以粘性土为持力层的预制桩实测承载力普遍低于理论值,主要是因为休止期较短及对端承力作用认识不足。
Pile foundation is widely used in construction in Shanghai region, but the site test data on bearing capacity of pre-cast concrete pile based on cohesive soil were lower than theoretical level.
上海地区建筑工程普遍采用桩基,但以粘性土为持力层的预制桩实测承载力普遍低于理论值,主要是因为休止期较短及对端承力作用认识不足。
应用推荐