Based on the investigation and analysis on the engineering geological conditions, this paper puts forward the high slope consolidation measures such as pre stressed anchorage technology.
在对工程地质等具体情况进行分析的基础上,提出了厂后高边坡加固处理工程措施,其中主要措施是应用预应力锚固技术并取得了良好的效。
Based on the investigation and analysis on the engineering geological conditions, this paper puts forward the high slope consolidation measures such as pre stressed anchorage technology.
在对工程地质等具体情况进行分析的基础上,提出了厂后高边坡加固处理工程措施,其中主要措施是应用预应力锚固技术并取得了良好的效。
应用推荐