Black start Black start refers to the starting of a power system with its own power sources, without the assistance from external power supplies.
黑启动黑启动是指依靠系统内部的电源,而不借助外部的电力进行的启动。
When a small system is in on-load operation in the early stage of black start, unit paralleling may fail due to reverse power protection.
黑启动初始阶段,小系统空载运行的情况下,由于逆功率保护而往往发生机组并车失败问题。
This research aims to study over voltage induced by under-excitation limitation moves in black start of the power system.
对黑启动过程中发电机带空载长线路可能出现的欠励限制动作导致的系统工频电压升高问题进行了研究。
Black start is important to power system safety. As an integrant part of black start, reasonable network reconfiguration is helpful to establish the main network and restore loads quickly.
电力系统全停电后的黑启动恢复问题是电力系统安全防御的重要课题,合理的网络重构策略对于快速建立输电网架、全面恢复负荷具有重要意义。
This paper discusses the method to make protection scheme for system black-start with the case of the first black-start test of Hubei power system.
文章以湖北电网首次黑启动试验为例,讨论制订黑启动过程的继电保护方案的思路和方法。
Under the condition of total or partial power net breakdown, system recovery can be realized by black-start scheme, in which units with self-start ability are used to bring others to start up.
电网全部或部分因故障停运后,采用黑启动方案,通过系统中具有自启动能力的机组带动无自启动能力的机组,可实现整个电网的恢复。
The power system restoration plan after all black-out, also called black-start , is an important problem which ensure the power system securely.
电力系统全停后的恢复计划即黑启动,是保证现代电力系统安全运行的重要课题。
Black start - up is one of the important means for quick recovery of electric power system failure, and it can reduce the loss and meet the demand for emergency use.
黑启动是电力系统故障后迅速恢复的重要措施之一,可减少系统事故损失,满足系统紧急事故备用要求。
It proves that the isolated network control system is effective method to restore the fault of power grids, and to solve the problem of black-start.
证明了孤立电网控制系统是恢复电网故障、解决黑启动问题的有效途径。
With the deepening of research, the study on power system restoration has expanded from the black-start to skeleton restoration.
随着研究的深入,对电力系统恢复的研究已经由原来的黑启动阶段扩展到网架恢复阶段。
With the deepening of research, the study on power system restoration has expanded from the black-start to skeleton restoration.
随着研究的深入,对电力系统恢复的研究已经由原来的黑启动阶段扩展到网架恢复阶段。