• Pan Jiazhen, He Jing, eds. Hydropower engineering in China (Engineering Geology Serier). Beijing: China Electric Power Press, 2000.

    潘家铮,何璟主编。中国水力发电工程(工程地质卷)

    youdao

  • Connected to power, press the voltage switch button, rotate adjustment handle clockwise slowly, and adjust the voltage to 20-30 Kilo volts.

    接通电源后,按下高压开关按钮,顺时针慢慢转动调节手把,将电压调至2~3万伏。

    youdao

  • Connected to power, press the voltage switch button, rotate adjustment handle clockwise slowly, and adjust the voltage to 20-30 Kilo volts.

    接通电源后,按下高压开关按钮,顺时针慢慢转动调节手把,将电压调至2~3万伏。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定