These provide evidences for the further through study of the point-load test with irregular specimens.
为进一步深入研究不规则试件的点载荷试验提供了一些依据。
The point-load tests were performed for the specimens of optical glass, arenaceous shale and sandstone.
做了光学玻璃、砂质页岩和砂岩等材料试样点荷载试验。
Client mode performance can vary with network load, even to the point of breaking the connection.
客户机模式性能可能因网络负载,甚至断开连接的点的不同而不同。
If we have both, for quick fallback, we could just point to the old load module in our JCL.
如果两者都有,我们就可以快速回退,只要指向JCL中旧的加载模块即可。
For now, we didn't see this as a performance concern, since the CPU load never become stressed at any point in the test.
在现在为止,我们没有看到性能的问题,因为在测试的任何一个点上CPU的负载从没变得紧张。
We generated and delivered an average of 70,000 messages during each user load point.
在每个用户负载点,我们平均生成并传递了70,000条消息。
At this point, you can load the example files to make sure you've got a working TCPDF installation.
在这一点上,您可以加载示例文件以确保您拥有一个正在运行的TCPDF安装。
They allow Jack to live, and load him into the waiting car at the escape point.
他们没有杀死杰克,将他推入了一辆等候在逃离地点处的车上。
But then again, if you are at that point of your implementation, consider looking into a load balancer.
但是同样,使用这种实现时,请考虑寻找一种负载平衡器。
The size of the database is determined at the point where we load the database. To load the database, we use the loaddb.bat
数据库的大小是在我们装载数据库的地方决定的。
There is a point in the load curve where response time degradation is directly due to the number of requests the application is processing.
负载曲线中有一点表示响应时间的增加的直接原因是应用程序处理的请求的数量。
If the tests don't load the server to the point where things break, you won't detect some of the problems, so be sure you load your server beyond your expected peak traffic.
如果测试没有使服务器负载达到临界点,则有些问题将检测不到,所以要确保服务器的负载超过您预期的最高峰流量。
For each of these that was filled out as a power word (" lead ", say, instead of "load") the participant was secretly given a score of one point.
如果被填空的词汇与权力有关(比如“领_”被填成“领导”而不是“领悟”)那么研究者便在私下给参与者打一分。
Consider that response time generally will change (it will probably increase) as the load against the site increases, potentially increasing to the point where it is unacceptable to users.
可以考虑到,随着站点负载的增加,响应时间通常将会发生变化(它可能会增加),最终可能增加到用户无法接受的情况。
Load testing to the point of breaking the server(s) lets you know the performance envelope of you systems.
将负载加到最大,直到服务器运行中止,这样做可以发现系统的性能极限。
So we're going to load it up to the point that it will break, and that allows us to measure the ultimate tensile strength.
我们将继续装物体,直到断裂点,这样我们就能测量到,极限抗拉强度的大小。
Quietly, he changed the weapon's load from hook point and line to live ammunition, then peered along the sight at the woman's face.
安静地,他改变了来自钩点和线的武器负荷居住军火,然后在女人的脸沿著视力凝视。
Configure two identical remote search servers on different nodes, point the search administration portlet to each of them, and configure a load balancer to balance requests between them.
在不同的节点上配置两个相同的远程搜索服务器,让搜索管理Portlet指向它们,并配置一个用来在两者间均衡请求的负载均衡器。
Through the use of point-to-point queues and having the event stream load balanced by MQ from the inbound side, you can ensure that there are no duplicate events being received by Business Events.
通过利用点对点队列,以及通过MQ使是事件流负荷从入站边保持平衡,可以确保没有复制事件被Business Events接受。
Load the data file bmw-training.arff (see Download) into WEKA using the same steps we've used up to this point.
使用我们之前使用过的相同步骤来将数据文件bmw - training . arff(参见下载)载入WEKA。
Whether this is more for the boy's sake or the father's remains unclear; at one point in the film Aziz is asked whether it is fair to load his ambitions on his son, and does not answer.
这件事究竟更多的是为儿子的未来考虑呢还是基于老子自己的谋划安排———目前还不甚明了。影片提及的一个细节是,当Aziz被问到如此雄心壮志硬插在儿子头上是否公平合理时,他的回答是否定的。
Load the data file bmw-training.arff into WEKA using the same steps we've used to this point in the Preprocess TAB.
将数据文件bmw - training . arff载入WEKA,步骤与我们之前在Preprocess选项卡中使用的相同。
The LCC carried 5.8 million passengers in June, up 13% from the year-ago month. Load factor rose 1 point to 82%.
瑞安航空六月份载客量达到580万,同比增长13%,客座率提高了1%,达到82%。
New concepts of top point load, arc load, top point state, net shape, net base, dissipated net andopencircuitvariable structure net are introduced into distribution net.
在配电变结构耗散网络中引入顶点负荷、负荷、点状态、形、基、散网络、环变结构网络等新概念。
The most crucial point to the dynamic analysis is the drawing of alternating current load line .
动态分析的对象是交流通路,图解法动态分析的关键是作交流负载线。
This paper discusses the relation between engineering properties and geological characteristics of red sandstone, and presents the point load test results of the same.
本文主要讨论了红砂岩的地质特征与其工程性质之间的密切关系,并且得出了使用点荷载试验研究红砂岩工程性质的结果。
Elastic cushion disperses the concentrated load applied by punches of multi-point die effectively.
弹性垫能够有效地分散多点模具冲头的集中载荷。
Abstract : A series of uniaxial compression test, Brazilian test, crushing compression test and point load test on coal samples from Zhangcun mine 3# coal seam were carried out.
摘要通过对漳村煤矿3#煤层煤样进行单轴压缩、巴西劈裂、捣碎法以及点荷载试验,对试验结果进行分析。
Diametral point load test is a very promising, simple and accurate method for obtaining compressive and tensile strength data of rock core.
用岩芯进行径向点荷试验,是简单而较精确地获得岩石抗拉、抗压强度的极有前途的方法。
Diametral point load test is a very promising, simple and accurate method for obtaining compressive and tensile strength data of rock core.
用岩芯进行径向点荷试验,是简单而较精确地获得岩石抗拉、抗压强度的极有前途的方法。
应用推荐