• The modeling of a hybrid measurement system is proposed which includes traditional SCADA measurements and partially equipped PMUs.

    该文提出了在传统SCADA系统的基础上,部分地安装PMU以后混合量测系统的状态估计模型

    youdao

  • By using comparing measurement and simulating power generator signal output, the new developed portable PMU field measuring instrument can calibrate the field PMUs.

    采用比对测量模拟发电机信号输出的方法,使研制便携式P MU现场测试仪对现场的PMU进行校核。

    youdao

  • Based on the model, the precision improvement of state estimation due to incorporation of PMUs can be analyzed quantitatively and the scheme of PMU placement can be established.

    基于模型定量地分析引入PMU以后状态估计精度改善程度。进而讨论了以提高状态估计精度为目标的PMU配置方案

    youdao

  • Based on the model, the precision improvement of state estimation due to incorporation of PMUs can be analyzed quantitatively and the scheme of PMU placement can be established.

    基于模型定量地分析引入PMU以后状态估计精度改善程度。进而讨论了以提高状态估计精度为目标的PMU配置方案

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定