This paper describes the study results and actual application instances of national-made insulation materials of the stator and rotor windings for Sanxia Left Bank Power Plant Generators.
介绍了三峡左岸电站水轮发电机定转子绕组绝缘材料的国产化研究成果和实际应用情况。
That triggered the emergency diesel generators to startup and provide backup power for plant systems.
由此工厂自备紧急柴油发电机启动为工厂提供电力。
Before the tsunami hit, the cooling system was operated by diesel generators in the plant [to compensate for] a loss of external power sources after the earthquake.
在海啸到来之前,核电站里的冷却系统是由柴油发电机发动的,[为了补偿]地震后外部能源的缺损。
Some investors are backing jatropha, a plant whose seeds produce an oil for burning in generators.
许多投资人都在提供资金研究一种叫做jatropha的植物,它的种籽能被加工成用于发电机里的燃油。
Roughly half an hour later, however, a wall of water breached the sea wall protecting the Fukushima Daiichi plant - one of the closest to the epicentre - and struck the main back-up generators.
然而,大约在半小时之后,巨浪冲垮了距震中最近的福岛第一核电站的海堤,并摧毁了主要的备用发电机。
The quake and tsunami cut the supply of off-site power to the plant and diesel generators intended to provide back-up electricity to the cooling system.
这次强烈的地震和海啸毁坏了电厂的外部电源和以柴油为动力的后备电源。这些电源是用于和电站紧急情况下为冷却系统提供电力供应的电源。
The nuclear plant lost its main source of electric power to drive the pumps, and the tsunami knocked out the backup diesel generators that were supposed to drive the pumps in an emergency.
核电站失去了驱动冷却水泵的主要电力来源,海啸损毁了本应在紧急情况下驱动水泵的备用柴油发电机。
Officials also said they were hoping that they would restore "as soon as possible" the power supply to the plant, which is needed for the cooling system and back-up generators.
有官员表示他们寄希望于能够尽快恢复电站的动力供应,以便能够冷却系统和备用发电机。
The power output of a wind power plant is stochastic, which is determined by the wind and wind turbine generators.
风资源最大的特点就是风速的大小和方向的随机性,风的这种特性决定了风力发电厂输出功率的随机性。
This paper researches the design of wind turbine generators tower foundation based on the project of Xuwen Yangqian wind power plant in Guangdong.
基于广东徐闻洋前风电场工程,对风力发电机组塔架基础设计进行研究。
Then the Tsunami came much bigger than people had expected when building the power plant (see above factor 7). The tsunami took out all multiple sets of backup Diesel generators.
然后海啸来了,比设计制造电厂时估计的情况糟糕很多,海啸干掉了所有备用发电系统。
Air Pollution Control:power plant scrubbers, electrostatic precipitators, waste-heat recovery systems, smelting scrubbers, and scrubbers for industrial boilers and inert-gas generators.
空气污染控制:电厂除尘洗涤装置,电除尘器,余热回收系统,工业锅炉,熔炼洗涤及惰气发生器的洗涤装备;
Air Pollution Control:power plant scrubbers, electrostatic precipitators, waste-heat recovery systems, smelting scrubbers, and scrubbers for industrial boilers and inert-gas generators.
空气污染控制:电厂除尘洗涤装置,电除尘器,余热回收系统,工业锅炉,熔炼洗涤及惰气发生器的洗涤装备;
应用推荐