The fourth part is the demonstration research of the talent planning model of KD in military medicine.
军事医学重点学科人才规划模型的实证研究。
Then, a multi-objective two-stage distribution planning model based on fuzzy satisfaction is put forward.
其次,提出了基于模糊满意度的多目标配电网两阶段规划模型。
This paper proposes an automatic planning model for the selection of tie lines between electrical power systems.
本文提出了一个选择电力系统交流联络线的自动规划模型。
An improved model based on the traditional planning model of sewage plants and GA applicable to the model was proposed.
在传统厂群规划模型基础上,提出改进的污水处理厂厂群规划模型,并构造了适合该模型的遗传算法。
In this paper, calculation method of area optimum planning model in water pollution controlling system is studied deeply.
本文着重对水污染控制系统区域最优规划模型的计算方法进行了较为深入的研究。
The paper tries to use linear planning model in the proportioning of raw slurry so as to improve the qualified rate of raw slurry.
本文试图将运筹学的高级工具线性规划模型应用于生料浆的调配中,为提高生料浆合格率探索一条可行的途径。
The multi-objective fuzzy process planning model with many restraints is effective to solve optimal choice among many work programmes.
多目标多约束的模糊规划模型对解决多个工艺规划的优化选择是行之有效的。
Based on credibility theory and two-stage fuzzy optimization method, this paper presents a new class of fuzzy production planning model.
基于可信性理论和两阶段模糊优化方法,提出一类新的模糊生产计划模型。
And the method ology of process-oriented land use planning mainly comprises setting up planning model, compiling plans and assessing plans.
基于过程的土地利用规划方法包括建立规划模型的方法、编制规划方案的方法以及评价规划方案的方法。
Under severe weather or flow constrained areas, a new rerouting path planning model based on artificial potential field algorithm (APFA) was proposed.
在恶劣天气或流量受限条件下,建立了基于人工势场算法的改航路径规划模型。
This paper builds up the supply chain planning model for the occasions of distributed multi-vendors, multi-plants, multi-distributors and multi-customers.
本文针对分布式多供应商、多工厂、多分销商和多客户的情况,建立了供应链生产计划模型。
The last part of the thesis is the summary of the full text, this part also describes the future development prospects of SOA-based service planning model.
文章的第六部分对全文进行了总结,并对基于SOA的服务规划模式的发展前景进行了展望。
Based on analyzing the machining process planning, the universal process planning model is presented using the principle and method of systematic engineering.
在分析机械加工工艺规程基础上,运用系统工程学的原理和方法,建立了通用工艺规程模型。
The main focuses are the method of grey planning model build-up, the procedure of grey model solution, and the application of grey model in watershed planning.
主要报告了如何建立灰色规划模型,如何求取规划模型的灰色解,如何将灰色规划解应用于流域规划等。
This paper discusses on developing an integrated evacuation planning model to assist government to draw up an appropriate evacuation strategy for a large urban area.
探讨了如何建立一个综合性的疏散规划模型,为人员应急疏散管理提供决策支持。
The method to achieve the grey solution of the planning model is an approximate one, but it is effective, which can be widely used to solve similar planning problem.
文中介绍的求解灰色规划解的方法是一种近似方法,但十分有效,可以应用于求解类似的规划问题。
The blackstart power source planning model based on minimization of social interruption cost is proposed to optimize the capacity and location of the blackstart unit.
建立了以社会停电损失最小为目标的黑启动电源规划模型,用以优化黑启动电源的安装位置及容量。
By using the nonlinear programming theory, a optimal impulse satellite evasive trajectory planning model considering earth oblateness perturbation had been established.
利用非线性规划理论建立了脉冲推力能量最省的逃逸轨迹规划模型,并考虑非球形摄动的影响对模型进行了修正。
The model system of steelmaking-continuous casting-hot rolling integrated production planning is studied, and an integrated production planning model method is suggested.
研究了炼钢-连铸-热轧一体化生产计划编制的模型体系,提出一种一体化生产计划编制模型体系方法。
At last, a class of optic imaging satellites is taken as example for which autonomous planning model is constructed and corresponding guided solution algorithm is developed.
最后以一类光学成像卫星为对象,建立了其自主规划模型并开发了相应的导引式求解算法。
Based on the study of the traditional model and mathematical calculation, the paper proposes a planning model that considering limiting the power system short-circuit current.
本文研究了传统电网规划数学模型及求解方法,并在此基础上提出了一种考虑限制系统短路电流水平的数学规划模型。
The planning scheme solved by the traditional transmission expansion planning model under certain information doesn't have enough adaptability for future uncertain environment.
传统确定性因素下的输电网规划方法得到的规划方案对未来年不确定性环境的适应性较低。
The nonlinear characteristics of power network planning model is pointed out in the paper. the mathematical method and process of linearizing the original planning model is given.
本文指出了电力网规划模型固有的非线性特性,以及对其实施线性化的数学方法和过程。
Based on the conventional supply-side capacity expanded planning model and planning procedure, a basic frame of supply-side and demand-side integrated planning model is determined;
在传统的电力供应侧装机计划模型及计划过程的基础上,确定了电力供应侧与需求侧整体计划模型的基本框架结构;
In the last section, the feasibility and effectiveness of the planning model and method proposed in this paper are proved by the case of logistics centers planning in Xiangtan city.
最后,以湘潭市的城市物流中心规划为例,证明了本文中提出的规划模型和方法的可行性与有效性。
Based on the research of the basic principle of CBR (Case-based Reasoning), a process planning model based on CBR is founded, the process of CBR and withdrawing cases are determined.
在研究基于实例推理基本原理的基础上,建立了CBR的工艺规划模型,确定了基于实例的推理过程以及实例的提取过程。
On the condition that the stochastic equilibrium restraints are satisfied as the network clients select the path, the author presents bilevel planning model for traffic network design.
在考虑网络中用户的路径选择行为满足概率型随机平衡的条件下,给出了交通网络设计的双层规划模型,同时设计了基于差分的启发式求解算法。
Due to considering the constraints of static voltage stability, the calculation amount of the built planning model is increased, so the method to speed up the calculation is discussed.
计及静态电压稳定约束导致该模型的计算量增加了,文章最后对提高该模型计算速度的方法进行了探讨。
Due to considering the constraints of static voltage stability, the calculation amount of the built planning model is increased, so the method to speed up the calculation is discussed.
计及静态电压稳定约束导致该模型的计算量增加了,文章最后对提高该模型计算速度的方法进行了探讨。
应用推荐