Planning a project is just a matter of working out the right order to do things in.
规划一个项目就是要设计出正确的工作顺序。
It taught me that I not only needed to be good at planning a project, I also needed to excel in its delivery.
它告诉我们不仅仅要很好做到项目规划,也要在项目执行上精益求精。
Each software process has a different collection of activities, ways to organize a team, and very often techniques for planning a project.
每个软件过程都有一个不同的集合,它包括组织团队的活动方法以及规划项目常用的技术。
This goes together with planning: you turn a big and hairy project into a set of small furry balls you can always keep under control.
这与计划是相辅相成的:你要把一个庞大而棘手的项目变成一堆你总能控制住的毛茸茸的小球。
These artifacts must always be at hand before, during and after a project, because they offer a primary point of reference for planning, design, implementation, maintenance, and optimization methods.
在项目开始之前、进行期间以及结束之后,这些工件必须始终记在心里,因为它们提供了规划、设计、实施、维护及优化方法参考的要点。
Planning and estimating is basically a mechanism for first determining that the project is worth doing and later as an approach for keeping the project on track.
计划以及预估基本上是这样一种机制,首先,决定项目值得去做,然后作为一种方案,保持项目始终处于轨道中。
Identifying a list of core tasks will help you call out all the other details in your planning phase, project plan, estimation, and tracking.
确定核心任务的列表将有助于您列出计划阶段、项目计划、评估和跟踪中的所有其他细节。
Each addition to the development case should be balanced with the expected benefits in terms of time saving, quality gain, or providing a basis for project estimation, planning, and scope management.
向开发案例中添加的每一项元素都应该根据期望的效益进行平衡,您需要考虑的方面包括:时间节省、质量获得,或为项目评估、计划和范围管理提供的基础。
Prototype: Build a functional prototype based on your assumptions about how to support iterative project planning.
原型:基于你关于如何支持迭代项目计划的设想构建一个功能原型。
A top-down implementation requires more planning and design work to be completed at the beginning of the project.
自顶向下的实现需要在项目开始时完成更多计划和设计工作。
With the help of the Nutritional Research Project, I am in the planning stages of a scientific study that will document the extent of atherosclerotic plaque regression on the nutritarain diet.
在营养学研究项目的援助下,我正在规划阶段去做一个将会纪录食用植物营养食饮食对动脉硬化复原程度的科学研究。
Is managerial authorship central to the proper management of a project, as the management By Planning philosophy implies?
如同“以计划管理”哲学暗示的,管理的身份是恰当项目管理的核心么?
In such cases, the selection of a RUP variant can revolve around the anticipated distribution of artifacts created as an aid for project planning.
在这样的情况下,RUP变量的选择可以围绕预期的辅助项目计划的工件分布来考虑。
Except for the first two categories - defining the project and planning the work - the 10 major project management areas don't fall into a sequential path.
除第一类和第二类——定义项目范围和制定工作计划——之外,这10个主要的项目管理领域并不是一个顺序执行的过程。
Just as important are some of the non-technical processes, such as planning, running the project, and managing a live portal environment.
与此同等重要的还有一些非技术方面的流程,例如计划、运行项目和管理实际门户环境。
It offers a practical guide to large project issues such as architecture, requirements development, multi-level release planning, and team organization.
它为大型项目问题,例如,体系结构、需求开发、多级发布计划,以及团队组织,提供有实际意义的指导。
For information on how to create and manage a job search project plan see my blog entry on the topic, Using Project Planning Skills in a Job Search .
如果你想知道如何创建和管理一个求职项目计划,请看我的博客,标题是 项目计划技术在求职中的应用 。
The project definition is the primary deliverable from the planning process and describes all aspects of the project at a high level.
项目定义是计划过程最主要的成果,从较高的层次阐述了项目的林林总总。
Another situation in which patterns can be useful is if you are planning an SOA project and want to get a better understanding of some of the more common challenges others have dealt with.
模式发挥作用的另一个情况是在你正规划一个SOA项目并希望更好地理解他人已经解决的常规挑战的时候。
The purpose of the out-of-the-box delivery processes, as illustrated in Figure 3, is to provide the project manager with a quick starting point for planning and initiating a project.
不确定交付过程的目的就是为项目经理提供一个计划和初始化一个项目的快速开始点,如图3所示。
Planning - Define a strategy to develop and deliver a project plan, calculate overall and detailed sizing, define a work schedule, and establish milestones for major checkpoints.
计划 ——定义项目战略,包括开发和交付项目计划、计算总规模和各个部分的规模、定义工作进度表和为主要检查点建立里程碑。
It would be a better investment of time to stick with the RUP's project planning recommendations.
坚持做RUP的项目计划建议会是更好的时间投入。
Agile Manager is a free agile project management tool meant to provide better planning, prioritization and collaboration.
敏捷管理器是一种免费的敏捷项目管理工具,它的目的是要提供更好的计划、优先级排序和协作。
When planning and executing a RUP project, most if not all development teams face an interesting question: "Should we allow our iterations to 'overlap'?"
插图当计划并执行RUP项目时,大多数(如果不是全部的话)开发团队会遇到一个有趣的问题:“我们应该让迭代‘重叠’吗?”
We'll look at a simple fictional project, starting with high-level planning and requirements solicitation and moving through the phases of the Rational Unified Process (RUP).
我们将看一个将单的虚构的项目,并以高层次的计划和需求的引出作为开发,并将过渡到Rational统一过程(Rational Unified Process, RUP)的各个阶段。
Mr. Fresco and Ms. Meadows are planning the production of a major feature film to bring the Venus Project to a wider, global audience.
目前,Fresco和Meadows正在策划一部大型专题电影,向全球更多观众就介绍威尼斯工程。
The planning team must then present this supporting information to the executive governing body, or IT Capital Planning Community, for evaluation and a final decision on each proposed project.
项目团队必须为执行的治理团体,或IT资产计划委员会(IT CapitalPlanning Community)拿出支持信息,对每个被提议的项目进行评估并制定最终决策。
Consolidation into a single set of standards should be a goal of your disaster recovery planning project and an overall strategy of business continuity.
将它们整合为一组标准应该作为您的灾难恢复规划项目的目标,以及业务连续性的整体策略。
If detailed planning is a waste of time, measuring to a detailed plan created early in the project is dangerous and often dooms the project to fail.
如果详细地计划是浪费时间,那么在这个项目的早期度量这个详细的计划是很冒险的。这个项目通常注定会失败。
If detailed planning is a waste of time, measuring to a detailed plan created early in the project is dangerous and often dooms the project to fail.
如果详细地计划是浪费时间,那么在这个项目的早期度量这个详细的计划是很冒险的。这个项目通常注定会失败。
应用推荐