Then the plan of project management was presented as it's the guarantee for IS success.
然后介绍了奥的斯备件中心信息系统的项目管理计划,突出了项目管理是信息系统成功的保障。
Finally, the plan of project management of exhibition design based on life cycle theory was stressed which combined with practical example.
最后,结合具体实例,重点阐述了基于生命周期的展品设计项目管理方案。
In the early mapping of risks to iterations you don't need to create a detailed plan of project activities; just mapping risks to iterations is good enough for now.
在为迭代早期进行风险绘图时,您不必为项目的活动创建一个详细的计划,目前只需要为迭代绘制风险就足够了。
For the plan of project cost, this thesis took the order of "break down - summary - decomposition" to introduce inductive methods of the cost planning in construction industry.
对于项目本钱计划的制定,本文以“分解-汇总-分解”的思路,对施工行业的本钱计划制定方法进行回纳。
According to the analysis of the causations of fire disaster, combined with actual state, this paper poses several imagination of fire control plan of project building in Longtouqiao Reservoir.
通过对火灾发生原因的分析,结合实际情况对龙头桥水库工程建筑物的消防设计提出几点设想。
Decide project checkpoints for ODC assessment: Throughout all phases of the project lifecycle, you should plan to do an ODC assessment two or three times.
为odc的评估决定项目检查点:在项目整个生命周期中的所有阶段中,你应该计划做两次或者三次评估。
The implication is that everyone on the project should have input into the development and evolution of your project plan.
也就是说,参与项目的每个人都应该投入到项目计划的开发和进展中。
It is configurable but by default it shows the status of test execution by test plan within your project.
它是可配置的,但默认显示项目中基于测试计划的测试执行的状态。
Then we have an iteration plan, execution, and wrap-up which may be repeated over and again depending on the requirement of the project (followed by a post-iteration plan and finally a release).
接下来是迭代计划、执行和结束,根据项目的需求,这些步骤可能会重复多次。最后是迭代后计划和发布。
In managing the project plan, the project manager must work with the technical leads of the project to assign work, and to assess work completion.
在管理这个项目的计划中,项目经理必须与这个项目的技术领导者一起合作,来评估工作的完成进度。
And as project Managers we know that a solid, workable plan is essential to the success of any project!
而作为项目经理我们也知道一个明确可行的计划对项目的成功有多重要!
Product and portal development expertise could be necessary to help call out the details of a project plan.
可能必须要有产品和门户开发专业知识才能列出项目计划的细节。
While we at QUT will continue to be heavily involved in the project, we plan to transfer full control and ownership of the project to the open source community.
尽管我们在QUT(昆士兰理工大学)的团队仍将继续深入参与到项目当中,但是我们计划将项目的完全控制权和所有权转交给开源社区。
Even when the plan is complete, the task of managing to a plan requires skill and experience beyond many project managers.
甚至在制订好计划之后,计划的任务管理所需的技能和经验都不是许多项目经理力所能及的。
A gender component was introduced after the Bank prepared its 2002 gender Action Plan, resulting in a greater participation of women in project design and activities.
2002年世行编制其《性别行动计划》后,该规划还增设了性别内容,进而提高了妇女在项目设计和活动中的参与程度。
It will provide your work plan and describe the activities necessary for the completion of your project.
该部分要提出你的工作计划,并说明完成你项目所需的必要活动。
Document these assumptions and constraints so that when you go to update your plan throughout the project you can remember some of the "unusual" decisions you made previously.
将这些假设和约束编入文档,这样,当您实施项目的任何时候更新计划时,都可以记起您先前做出的一些“不寻常”决定。
An estimate is a key element of the project plan and schedule, and the consequences of poor estimating are failed projects.
评估是项目计划和安排的一个重要组成部分,评估不当的结果就是项目失败。
The degree of change to a plan indicates the depth of what was unknown at the beginning of the project.
计划改变的程度指示出我们在项目开始阶段不知道的内容的深度。
Expertise is often required in building a project plan that Outlines all of the tasks that will be required for your portal project, so you seriously want to consider how you resource your project.
在制订列出门户项目所需的全部任务的项目计划时,常常需要专业知识,因此,您肯定需要考虑如何安排项目的资源。
Hence, the first step is to create a plan to guide the successful execution of the project proposal.
因此,第一步是创建一个计划,用它指导项目提案,使之得以成功执行。
Calendars. Other than Niko-niko calendars, there are a lot of variations of using calendars to show project status or plan.
除了表情日历之外,还有很多日历变种可以用来显示项目的状态或者计划。
Refine the adoption plan to reflect the specific needs of the business unit or development project.
定义采用计划,以反映业务单元或者开发项目的特定需要。
The project plan also identified the priority of tasks among individual developers and the overall priority of release candidates.
项目计划也会为个体开发人员确定任务优先级,还确定候选版本的整体优先级。
Adopt RUP best practices and be guided by the spirit of RUP. Restructuring your project plan is not enough.
采用RUP最优方法并且使用RUP作为导向重构你的项目计划还不够。
Project management requires a way to effectively plan, track, and manage all aspects of GDD project and resource portfolios.
项目管理需要一种有效的方法进行计划、追踪并对GDD项目所有方面及资源组合进行管理。
An SOA governance and adoption plan is critical to the success of an SOA project.
soa治理和采用计划对SOA项目的成功非常关键。
Rather than prescribing a plan-build-assemble sequence of activities for a software project, they describe an iterative, incremental process that steers development teams toward results.
它们描述了一个迭代的,递增的,引导开发团队实现结果的过程,而不是为一个软件项目指示一个计划-建立-组装的活动序列。
Ensuring that the project is part of the plan for incremental adoption of SOA as part of an overall roadmap of business and IT objectives.
确保该项目是作为总体业务和IT目标路线图一部分的渐进soa采用计划的一部分。
Ensuring that the project is part of the plan for incremental adoption of SOA as part of an overall roadmap of business and IT objectives.
确保该项目是作为总体业务和IT目标路线图一部分的渐进soa采用计划的一部分。
应用推荐