Concrete shall be deposited by carefully placing concrete in its final position by means of tremie.
用漏斗管仔细地将混凝土浇注到它的最终位置。
Placing concrete plug on site to substitute the weak plane is adopted after comparing several treatment schemes.
经多种处理方案比较,选用混凝土洞塞来置换一定范围的地质软弱面。
Placing concrete plug on site to substitute the weak plane is adopted after comparing several treatment schemes.
经多种处理方案比较,选用混凝土洞塞来置换一定范围的地质软弱面。
应用推荐