• The single nucleotide polymorphisms (SNP) of pituitary specific transcription factor 1 (PIT-1) gene was analyzed in Xiang pig, Shanghai White pig and Yorkshire pig.

    对香猪、上海白猪、大约克夏猪的垂体特异性转录因子(PIT - 1)基因进行了单核苷酸多态性(snp)分析。

    youdao

  • Revelation 9:1 and the fifth angel sounded, and I saw a star fall from heaven unto the earth: and to him was given the key of the bottomless pit.

    启9:1第五位天使吹号,我就看见一个星从天落到地上,有无底坑的钥匙赐给它。

    youdao

  • It is showed that:(1)the major surface damage patterns due to grinding are microplastic deformation trace, fracture chipping pit, microcracks, and subsidence in the loosen region of material;

    结果表明:磨削损伤的主要形式有显微塑性变形磨痕、断裂剥落坑、磨削微裂纹和材料疏松区的塌坑;

    youdao

  • ANSYS software has been applied successfully in construction of deep foundation pit excavation in Shanghai South Station reconstruction project of Shanghai Metro Line No 1.

    ANSYS软件已成功应用于上海地铁1号线上海南站车站改建工程地下结构的深基坑开挖施工工程中。

    youdao

  • After the restart, Rainey scored his fastest time of 1:49.825 on lap 2. He came in to the pit immediately and waited for further actions.

    比赛重新开始后,何晓乐在第2圈跑出了他自己的最快圈速1:49 . 825。随后,他回到维修区等待车队的安排。

    youdao

  • For a new twist, brush a halved avocado (pit removed) with olive oil and grill 1 minute.

    一个新的吃法:牛油果去核,一半刷上橄榄油然后烤一分钟。

    youdao

  • Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro.

    深圳地铁一期工程少年宫站开挖基坑围护结构采用1∶0.3的放坡结合土钉加预应力锚索联合支护体系。

    youdao

  • Open-cut slopes of 1:0.3 gradient reinforced by soil nails and pre-stressed anchoring cables are adopted for the foundation pit of Shaoniangong station of phase 1 of Shenzhen Metro.

    深圳地铁一期工程少年宫站开挖基坑围护结构采用1∶0.3的放坡结合土钉加预应力锚索联合支护体系。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定