Supporting system used in most of the girder transfer floor construction in high-rise building is steel pipe with fastener.
在高层建筑梁式转换层的施工中,多用扣件式钢管支撑系统。
In its construction, engineers adopted fastener steel pipe frames to support the semi-spherical dome in order to replace reinforcement concrete and foundation of the station.
本文论述沈阳老站圆形候车大厅保护性改造工程中,采用扣件钢管框架支撑半球形穹盖进行更换钢筋混凝土柱及基础的施工。
The utility model discloses a steel pipe elongation fastener, which is used for slightly elongating a steel pipe.
一种用于使钢管略微伸长的钢管伸长扣件。
The present, stability analysis of fastener-style steel pipe formwork support system is changed to single stand bar stability.
目前规范对扣件式钢管模板支撑体系整体的稳定性,是将其转化成单杆立杆的稳定性计算来考虑的。
Abstract:The paper compares the cost performance of four practice of wall fastener by value engineering principle, such as embedded pipe, embedded steel bar, embedded steel plate and after the anchor.
摘要:采用价值工程原理,比较预埋钢管法、预埋钢筋法、预埋铁板法、后锚固法的连墙件性价比。
Abstract:The paper compares the cost performance of four practice of wall fastener by value engineering principle, such as embedded pipe, embedded steel bar, embedded steel plate and after the anchor.
摘要:采用价值工程原理,比较预埋钢管法、预埋钢筋法、预埋铁板法、后锚固法的连墙件性价比。
应用推荐