Cut-off grade method has been used to control the ore drawing in non-pillar sublevel caving mining both in and outside China.
采用无底柱分段崩落采矿法,国内外一直采用截止品位放矿法来控制出矿。
Because of anciently usually adopting empirical method to determine the structure parameter of non pillar sublevel caving, there are hard to guarantee parameter optimize.
由于无底柱分段崩落法结构参数一直采用经验方法确定,很难保证结构参数最佳,本文分析了放出体和矿石堆体的形态及其影响因素。
Deficient floor slope Angle of an ore body often needs to dig a drift (or access) in its footwall rock when adopting non-pillar sublevel caving following-vein excavation.
采用沿脉布置的无底柱分段崩落法,当矿体底板倾角不足时,需要在下盘岩石中开掘进路。
The article analyzes how the hanging arch is caused during non-pillar sublevel caving in Jingtieshan mine, in order to provide a reference for rational mining organization and resources utilization.
本文着重分析了镜铁山矿无底柱崩落法悬顶问题,为合理安排矿山生产,合理利用矿产资源,提供了参考依据。
The paper is of important instructive importance to reduce loss and depletion by sublevel caving method without sill pillar.
并对今后无底柱分段崩落法降低损失贫化具有重要的指导意义。
Sublevel caving method without sill pillar is adopted in the south section of Fengshan Copper Mine.
丰山铜矿南缘采区应用无底柱分段崩落法采矿。
Disadvantages of sublevel caving without sill pillar lie in high ore loss and dilution as well as difficult control of ore loss and dilution.
无底柱分段崩落采矿法存在损失贫化大和损失贫化难以控制的缺点。
Sublevel caving without bottom pillar is the method of mining used at Huashugou Mine, Jiuchun Iron and Steel Co.
酒泉钢铁公司桦树沟铁矿所用采矿方法是无底柱分段崩落采矿方法。
Sublevel caving without sill pillar is used in Xishimen Iron Mine.
西石门铁矿采用无底柱分段崩落采矿法开采。
Sublevel caving without sill pillar is used in Xishimen Iron Mine.
西石门铁矿采用无底柱分段崩落采矿法开采。