• Room-and pillar mining method with small room and pillar.

    、小矿柱的房柱

    youdao

  • The main technology to realize high production and high efficiency in abroad is fully mechanized long-wall mining for a single seam or room-and-pillar mining.

    国外高产高效矿井建设是以单一煤层长壁房柱式综合机械化主要开采技术

    youdao

  • The feasibility of the protective coal pillar mining in the artificial inclined steep drift in the thick (ultra thick) coal seam of a large slope is discussed.

    论证倾斜(厚)煤层伪斜上山保护煤柱回收可行性。

    youdao

  • Mining industry has fully been as basic industry and it also has become one of the important pillar industries for national economy of Anhui Province.

    矿业充分发挥基础产业作用,成为安徽省国民经济重要支柱产业之一

    youdao

  • Recovering coal by sublevel mining pillar and not damaging the houses on ground is introduced.

    条带开采煤柱回收煤炭资源破坏地面房屋、住宅。

    youdao

  • Through the detail introduction on optimization of raining method in Shandong Wangcun Bauxite Mine, this paper puts forward a new mining method——longwall caving with artificial roof pillar.

    通过山东王村铝土矿采矿方法优化介绍提出一种新的采矿方法——人工顶柱无底长壁式崩落法

    youdao

  • Roof falling, floor heave of roadway and pillar failure are important problems of rock mechanics in mining process.

    顶板冒落、巷道矿柱破坏采矿过程中的重要岩石力学问题

    youdao

  • The mechanical model of key strata supported by coal pillar is set up according to the layout of coal pillars in the coalface of short wall mining.

    根据开采条件下保护煤柱布设特点,建立保护煤柱支承关键力学分析模型

    youdao

  • It is first raised that safety coefficient can be calculated by using the widths of yield zone and pillar, and the steps of designing the strip mining size are pro-posed.

    首次提出了根据屈服宽度条带煤柱宽度来确定条带开采安全系数方法,同时给出了设计条带开采尺寸聚。

    youdao

  • Sublevel caving without bottom pillar is the method of mining used at Huashugou Mine, Jiuchun Iron and Steel Co.

    酒泉钢铁公司桦树沟铁矿所用采矿方法分段崩落采矿方法。

    youdao

  • By using an explicit finite difference program FLAC3D, a model of numerical calculation is established for a deep mining pillar with dynamic disturbance under high stress.

    深部矿柱承受高静载应力时的动力扰动力学模型进行应力波传播力学响应分析,采用FLAC3D有限差分程序深部开采圆形矿柱进行应力下动力扰动数值计算。

    youdao

  • Bolting manual pillar and room method is a good future method of mining Mn ore body of medium thickness and small pitch.

    人工锚杆房一种前途开采缓倾斜锰矿床的采矿方法

    youdao

  • In our country, there are 48 cities established on coal mining, and the notable features of these cities are that the pillar industry is closely related to the resource exploiting.

    我国主要以煤炭开采为主建立煤炭城市48座。这些城市的突出特点支柱产业资源开发息息相关

    youdao

  • The stability of boundary pillar, which can be found across in mine shifting from open-pit to underground mining, is very important for safe production of underground mine.

    境界矿柱稳定性分析露天地下矿山经常遇到的问题,对于矿山进行地下开采安全生产极其重要

    youdao

  • Applying small pillar to protecting roadway is a wide used layout in mining roadway.

    煤柱工作面上风巷普遍采用一种布置方式。

    youdao

  • Whether the section coal pillar is stable or not is the key to safety of irregular blocks coal mining.

    区段保护煤柱稳定与否不规则块段安全开采关键

    youdao

  • And gold, once the pillar of South Africa's mining wealth, has been in decline.

    而且黄金曾经南非矿业财富支柱,产量也已经下降

    youdao

  • The stability of coal pillar of the short-wall mining was analyzed systemically by numerical simulation with the rock failure process analysis software (RFPA2D).

    采用岩石破裂过程分析软件RFPA2D系统机械化开采煤柱稳定性进行数值计算分析。

    youdao

  • The technology and practice of artifical pumpcrete pillar support is briefly introduced in this paper. The mining test was carried out using the pillars, at 2364 stope of Woxi mining district.

    介绍了泵送混凝土人工支护工艺,并对该工艺进行了一系列可操作性试验湘西金矿沃溪矿区2364采场进行了采矿试验。

    youdao

  • It may be used for reference in mining design, production management of strip mining and the stability studies of similar pillar.

    条带采煤开采设计生产管理以及类似矿体稳定性研究有很重要的参考价值

    youdao

  • The study indicates that with the increase of the coal pillar width the peak mining stress delays its appearance and the increase of the displacement and stress are not synchronous.

    研究表明,综放沿空留巷受采场影响时间程度留巷煤柱宽度增加表现出明显滞后现象以及位移和压力增长的不同步现象。

    youdao

  • Modelling tests are made to study problems of supporting state of coal pillar together with characteristics of overlying strata and surface movement in partial mining in this paper.

    本文通过相似材料模型试验探讨了条带法开采条带煤柱支撑状态地表移动问题

    youdao

  • Through theoretical analyses of the pillar stress and pillar strength in the pillar-and-stripe mining with backfilling, the rational pillar size and mining stripe opening are deter - mined.

    文章通过条带充填开采煤柱载荷煤柱强度理论分析,提出条带充填开采所需留设合理煤柱尺寸开采宽度

    youdao

  • If the mined zone go into the security coal pillar, the house crack could be thought caused by mining.

    房屋裂缝是否煤矿采煤引起,主要采空区是否进入村庄保安煤柱

    youdao

  • Based on the existing conditions, Pindu Municipal Gold Mine preferred short-hole shrinkage stoping without sill, intermediate and crown pillar to other mining methods and obtained excellent result.

    平度市金矿利用现有条件,因地制宜采用“三无”即底、间、矿柱浅扎留,收到了效果

    youdao

  • These studies have evident theoretical significance to decrease coal pillar size and enhance recovery ratio, and practical importance to solve the problems of irregular seam mining in our country.

    本文研究减小煤柱尺寸提高房柱式采煤回采具有明显理论指导意义,对解决我国生产矿区面临的不规则区段煤层开采问题具有实际意义

    youdao

  • These studies have evident theoretical significance to decrease coal pillar size and enhance recovery ratio, and practical importance to solve the problems of irregular seam mining in our country.

    本文研究减小煤柱尺寸提高房柱式采煤回采具有明显理论指导意义,对解决我国生产矿区面临的不规则区段煤层开采问题具有实际意义

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定