• The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.

    采场顶柱作为永久矿柱损失,采场底柱、间柱等采场大量放矿完毕,一次性进行回收

    youdao

  • Cut-off grade method has been used to control the ore drawing in non-pillar sublevel caving mining both in and outside China.

    采用无底柱分段崩落采矿国内外一直采用截止品位控制出矿。

    youdao

  • Population and application of the dilution ratio ore drawing method has certain social value and economic value for implementation of the sill pillar-free subdrifting method.

    贫化放推广应用对于实行无底分段崩落的矿山具有一定社会价值经济价值。

    youdao

  • Using straight-pillar orientation, push rod top expected, leading to complete drawing of patterns and winning ways of pumping core materials and components for the choice.

    利用直导导向推杆,斜顶杆完成脱模方式对模具的材料进行选择。

    youdao

  • Using straight-pillar orientation, push rod top expected, leading to complete drawing of patterns and winning ways of pumping core materials and components for the choice.

    利用直导导向推杆,斜顶杆完成脱模方式对模具的材料进行选择。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定