After using pneumatic rammer piling method, the construction cost was reduced, piling quality was raised and construction speed was increased.
改用气动夯锤打桩后,不仅节约了资金,而且提高了打桩的质量,加快了施工速度。
After testing pile and determining the load bearing capacity of single pile, the single piling method is adopted for construction.
采用沉管灌注桩法处理软土地基,经试桩并确定单桩承载力后,采用单打法进行施工。
After testing pile and determining the load bearing capacity of single pile, the single piling method is adopted for construction.
通过实践应用自平衡试桩法新技术,对大直径钻孔灌注桩承载能力进行检验,为解决施工中出现的类似问题提供经验。
After testing pile and determining the load bearing capacity of single pile, the single piling method is adopted for construction.
通过实践应用自平衡试桩法新技术,对大直径钻孔灌注桩承载能力进行检验,为解决施工中出现的类似问题提供经验。
应用推荐