• After using pneumatic rammer piling method, the construction cost was reduced, piling quality was raised and construction speed was increased.

    改用气动夯锤打桩后,不仅节约了资金,而且提高了打桩的质量,加快了施工速度。

    youdao

  • After testing pile and determining the load bearing capacity of single pile, the single piling method is adopted for construction.

    采用沉管灌注桩法处理软土地基,经试桩并确定单桩承载力后,采用单打法进行施工。

    youdao

  • After testing pile and determining the load bearing capacity of single pile, the single piling method is adopted for construction.

    通过实践应用自平衡试桩法新技术,对大直径钻孔灌注桩承载能力进行检验,为解决施工中出现的类似问题提供经验。

    youdao

  • After testing pile and determining the load bearing capacity of single pile, the single piling method is adopted for construction.

    通过实践应用自平衡试桩法新技术,对大直径钻孔灌注桩承载能力进行检验,为解决施工中出现的类似问题提供经验。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定