• The direct or indirect method to determine ultimate uplift load of anchored rod pile is proposed herein based on field tests in association with engineering practice.

    本文结合工程实践,通过现场试验分析研究提出锚杆极限荷载直接间接确定方法提出了合理的施工方案。

    youdao

  • Based on the load tests carried out in soft soil foundation treatment project of an expressway under construction, the effective cement-soil mixing pile length in composite foundation was explored.

    本文根据高速公路处理中不同长的泥土搅拌桩单桩载荷试验结果,探讨了复合地基中水泥土搅拌桩有效桩长。

    youdao

  • The relations between uplifting load , displacement and time were simulated numerically and compared with the results of actual pile tests, and the ultimate uplifting bearing capacity was defined.

    数值模拟荷载上拔位移关系与宏观物理实物试验实测结果作了对比分析;

    youdao

  • Based on the data obtained from the 17 groups of statistic loading tests and the corresponding calculation analysis, the load bearing capacity of Impaction Rootage-shaped Pile is investigated.

    通过17试桩载荷试验计算,对挤压支承载能力进行了计算分析研究

    youdao

  • Statistics through a large number of static load pile tests shows that hammer-driven pedestal piles through granite residual soil have advantages in their bearing capacity and cost.

    通过对大量试验成果统计证明花岗岩残积上中夯扩承载能力造价上的优势

    youdao

  • The load transfer mechanism of cement-soil pile composite foundations with different cushion heights were studied according to the results of static loading tests.

    根据载荷试验结果,研究褥垫层厚度荷载在水泥土搅拌桩四复合地基传递影响规律。

    youdao

  • The load transfer mechanism of cement-soil pile composite foundations with different cushion heights were studied according to the results of static loading tests.

    根据载荷试验结果,研究褥垫层厚度荷载在水泥土搅拌桩四复合地基传递影响规律。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定