Bearing upper load, a reinforced concrete structure with a pile foundation is the foundation of RH-TB vacuum recycling degassing installation.
TB真空循环脱气装置设备的基础是承载上部荷载的桩基承台钢筋混凝土结构。
An introduction is made on the construction process of artificial hole pile including holing, wall protection, fabrication and installation of reinforcing cage, pile core concrete grouting etc.
介绍人工挖孔桩的成孔、护壁、钢筋笼制作和安装、桩芯混凝土浇灌等施工过程。
The design, fabrication and installation of the steel casings and the problems to solve during the construction of the pile caps were summarized.
文章重点对钢套箱的设计制作、安装和施工中应注意的问题进行了总结。
The design and installation of a drilled grouting pile foundation is introduced. Accident is discovered by dynamic pile tests. The causes are analyzed and the remedies are proposed.
介绍了某工程钻孔灌注桩桩基设计与施工情况,并就动测结果发现桩基存在质量问题的原因进行剖析,并提出了补强加固措施。
This paper introduced various device related in test of vertical compression static bearing resistance of single pile, and discussed the requirement of selection and installation of various device.
介绍了单桩竖向抗压静载试验中涉及的各项仪器设备,讨论了各仪器设备的选择与安装要求。
Since the excavated hole is also the form of the pile shaft, its quality control plays an important role of the whole installation.
挖孔桩的孔筒是桩的模具,其成孔质量检验是桩基施工的重要组成部分。
Through investigation of a piled foundation. The shortcomings of installation of compacted enlarged pile are analyzed and also the improvement are proposed.
通过基桩检测,分析了夯扩灌注桩施工工艺的缺陷,并提出了改进建议。
Besides, the ration of the solution is verified by the single pile loading tests in different time period after installation.
现场不同间歇期的单桩载荷试验测试结果验证该理论解的合理性。
Besides, the ration of the solution is verified by the single pile loading tests in different time period after installation.
现场不同间歇期的单桩载荷试验测试结果验证该理论解的合理性。
应用推荐