The B-1 Fully Integrated Data Link (FIDL) flight test plan for Phase 1 concluded Oct. 16; it included nine sorties performed by the U.S. Air Force at Edwards Air Force Base.
这架采用全集成数据链(FIDL)的B-1轰炸机于10月16日结束第一阶段测试,其中包括在美国空军爱德华兹空军基地进行了9架次飞行。
The purpose of this phase is to specify refinements to the strategy as specified in the test plan and also to identify the test case, test setup and test software requirements.
这一阶段的目的是按照测试计划中的说明使测试策略变得更加精细,并且要确定测试用例、测试启动和测试软件需求。
The purpose of this phase is to specify refinements to the strategy as specified in the test plan and also to identify the test case, test setup and test software requirements.
这一阶段的目的是按照测试计划中的说明使测试策略变得更加精细,并且要确定测试用例、测试启动和测试软件需求。
应用推荐