The influence of the phase step of the broadband terahertz pulses on the edge contrast is discussed.
讨论了太赫兹脉冲在样品边缘处经历的相位阶跃与边缘对比度的关系。
A new design of five phase step motor driver based on CPLD is introduced. The driver can implement the full step and the half step control.
介绍了一种基于CPLD实现五相步进电机的驱动器的设计方案,可实现全步、半步控制。
After the development phase (Step 1), services (one or more VMs and the necessary configuration and deployment metadata) are packaged into the OVF format (Step 2).
经过开发阶段(步骤1)之后,服务(一个或多个VM,以及必要的配置和部署元数据)将封装为ovf格式(步骤2)。
Steps 1-4 are done during test planning phase, step 5 is done as part of test requirements, step 6 relates to test execution and step 7 is part of test reporting.
步骤1到4在测试计划阶段实施,步骤5作为测试需求的一部分,步骤6与测试执行有关而步骤7是测试报告的一部分。
Steps 1-4 are done during test planning phase, step 5 is done as part of test requirements, step 6 relates to test execution and step 7 is part of test reporting.
步骤1到4在测试计划阶段实施,步骤5作为测试需求的一部分,步骤6与测试执行有关而步骤7是测试报告的一部分。
应用推荐