• Then the selections of phase number, winding connection, pole number and number of branches in parallel are optimized according to the SRM's symmetry and order of force wave.

    接着对称性等角度研究了SR 电机数及绕组连接方式数、并联路数选择问题。

    youdao

  • A new method called phase-light showing measurement which is used to achieve the thing that synchronous generators are input in electric network by parallel connection are mentioned.

    介绍同步发电机并联投入电网的条件、不满足条件下并网所带来危害以及常用的并网方法提出了一种相灯指示法来实现发电机并网的方法。

    youdao

  • A new method called phase-light showing measurement which is used to achieve the thing that synchronous generators are input in electric network by parallel connection are mentioned.

    介绍同步发电机并联投入电网的条件、不满足条件下并网所带来危害以及常用的并网方法提出了一种相灯指示法来实现发电机并网的方法。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定