• Fatigue damage is the main destroy mode for the machinery parts and engineering structures under alternate loading over a long period of time.

    对于那些长期经受交变载荷作用机械零件工程构件疲劳破坏主要破坏模式

    youdao

  • The influence factors for removal efficiency sorting by priority are hydraulic loading period, the appending quantity of EM rejuvenation, soil depth.

    影响污染物去除效果因素的主次为,水力负荷周期EM投加土层厚度。

    youdao

  • This paper also presents a reduction factor of strength required for checking shock strength based on the test results of embedded elements under low period repeated loading.

    文章根据预埋件在反复荷载作用下试验结果提出进行抗震强度验算时所需强度折减系数

    youdao

  • Designed a long period (18 months) low - leakage balance cycle core loading, and developed a set of fuel management programme for the extension project of Qinshan's second nuclear power plant.

    研究设计周期(18个月)泄漏平衡循环秦山二期扩建工程制定了一具有工程实用价值燃料管理方案

    youdao

  • Abstract: Immediate implant loading technique has gained its popularity for the short treatment period and good prognosis.

    摘要种植义齿即刻负重技术由于缩短病人治疗周期良好的预后成为现代种植修复的潮流。

    youdao

  • Abstract: Immediate implant loading technique has gained its popularity for the short treatment period and good prognosis.

    摘要种植义齿即刻负重技术由于缩短病人治疗周期良好的预后成为现代种植修复的潮流。

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定