Each machine required at least one thorough inspection per shift and some received additional attention.
每台设备每班都必须彻底检查至少一次,有些设施还需要特别的关照。
Our company has lots of advance production lines including pressing, forging, heat treatment, welding, machining, assembly and painting etc. The production output reaches to 900 sets per shift.
公司现有冲压、锻造、热处理、焊接、机加工、装配、油漆等多条先进的生产线,单班生产能力达到900台套。
Layered Audits: a documented layered audit plan shall exist with a minimum frequency of once per shift.
分层审核:必须具备文件化的分层审核计划,审核的频次至少应该每班一次。
The machine is applicable for the feed mills and aquaculture farms with annual output of 1000-10000 tons per shift.
适合于年单班生产能力1000-10000吨的饲料加工厂、水产养殖场。
An FMS generally needs about three or four workers per shift to load and unload parts, change tools, and perform general maintenance.
一个FMS系统每个班次需三、四个工人来装卸零件、更换刀具和进行一般性维护。
An FMS generally needs about three or four workers per shift to load and unload parts, change tools, and perform general maintenance.
一个FMS系统每个班次需三、四个工人来装卸零件、更换刀具和进行一般性维护。
应用推荐