At this point, we have provided a catalog of PBE patterns (and related guidelines).
现在我们已经提供了PBE模式的列表(以及相关的指南)。
We can then build upon this base with the PBE Patterns and Guidelines and the associated PBE Practice.
然后,我们可以使用PBE模式和指引以及相关的PBE实践来构建这个基础。
The PBE patterns and Guidelines provide support as we identify, design, create, package and consume patterns.
PBE模式和使用指南为我们识别、设计、创建、打包和使用模式提供了支持。
In the case of the PBE patterns, these are indeed meta-patterns - that is, patterns for working with patterns.
在PBE模式的情况下,它们其实都是元模式——即用来使用模式的模式。
We’ve already mentioned the Patterns and Guidelines, so we’d like to take a minute to discuss the PBE Practice.
我们已经提到了模式和指南,所以我们想花点儿时间来讨论一下PBE实践。
Within this component, we detail the roles, tasks, work products, deliverables and workflow associated with PBE.
在这个组件中,我们详细描述了与PBE相关角色、任务、工作产品、可交付物以及工作流程。
When working with PBE we encourage and support the use of both pattern specifications and pattern implementations.
当使用PBE的时候,我们建议并支持使用模式说明以及模式实现。
To this end, within PBE we provide 3 constructs: a set of core values, a development practice and a set of patterns and guidelines.
为此目的,在PBE中我们提供了三种结构:一组核心价值、一种开发实践以及一组模式和指南。
The quadrature method of moment (QMOM) for population balance equation (PBE) with volume as the internal coordinate was investigated.
研究以体积为内部属性的群体平衡模型的矩积分求解方法。
InfoQ: PBE is an example of Model-driven development (MDD) mostly as a result of using the engineering metaphor as a philosophical base.
InfoQ:PBE是模型驱动开发(MDD)的典型示例,这主要是因为它使用了工程学隐喻作为哲学基础。
Is PBE as presented in your book also a first step that needs to be followed almost by rote, then adapted, and then ultimately transcended?
你在书中所展现的PBE也只是第一步,需要先照猫画虎,然后调整,最终才能够超越吗?
IBM has developed a novel MDD and pattern-based engineering (PBE) process, along with associated tooling, which simplifies and automates the use of constraints within a model.
IBM已经开发了一个新的MDD和基于模式的工程(PBE)过程,以及相关的工具,它简化并自动化了模型中约束的使用。
IBM has developed a novel MDD and pattern-based engineering (PBE) process, along with associated tooling, which simplifies and automates the use of constraints within a model.
IBM已经开发了一个新的MDD和基于模式的工程(PBE)过程,以及相关的工具,它简化并自动化了模型中约束的使用。
应用推荐