The fluxes which escape the core and pass through only one of the transformer winding are leakage fluxes.
而逃脱的通量的核心和通过唯一的变压器绕组有漏通量。
Then pass to check a great deal of data, establish to design the method and the step of the 110 kV transformer substation.
然后通过查阅大量资料,确立了设计110kV变电站的方法和步骤。
Then pass to check a great deal of data, establish to design the method and the step of the 110 kV transformer substation.
然后通过查阅大量资料,确立了设计110kV变电站的方法和步骤。
应用推荐