But recall that the scheduling classes are part of the task structure itself (see Figure 2).
但是不要忘了调度类是任务结构本身的一部分(参见图2)。
The trickiest part of a summer job hunt is, as you might imagine, scheduling interviews around people's vacations.
正如人们预想的一样,夏季求职最麻烦的是在休假期间安排面试。
Media in Seoul reported that the US had been due to take part in the training but had postponed involvement, citing scheduling conflicts.
首尔媒体报道美国因为参加军演而不得不以行程冲突的理由推迟介入。
Part of the solution is to implement per-CPU scheduling queues.
这个问题的解决方案是实现单cpu调度队列。
In Part 4 you will learn about annual training plans and weekly scheduling routines.
在第4部分你将学到年度训练计划和周例行训练。
As an important part of CIMS, the production planning and scheduling system is an obligatory layer in the CIMS function structure model.
生产计划与调度系统作为实施CIMS工程中的一个重要组成部分,是CIMS功能结构模型中不可缺少的一个层次。
Job scheduling is a key part in the computing grid system, a good scheduling method could enhance the performance of entire system.
任务调度是计算网格系统中极其关键的一部分,一种好的调度方法可以极大地提高整个系统的性能。
This allows the "work" of scheduling to be part of the applications "larger" transaction.
这使得“工作”的时间安排,申请成为“较大部分”交易。
Scheduling automated tests to run as part of the build process: You can use a test category to select the automated tests in your build definition that you want to run if the build is successful.
排定自动化测试做为建置流程的一部分执行:您可以使用测试分类,在建置定义中选取您要在建置成功时执行的自动化测试。
Constraint modification is the important part of imaging scheduling of earth observing satellite, it solves the problem of constraint satisfaction and optimization of the imaging scheduling.
约束修正是卫星成像调度的重要组成部分,负责处理成像调度方案的约束满足与优化的问题。
The mechanism by which a thread waits on a semaphore is part of the overall management of thread scheduling.
一个线程等待一个信号的机制。是线程管理的一部分。
The batch on-line scheduling problem is presented from the production of iron and steel plant, which is a main part of MES in process industry.
从钢铁生产热轧流程中提炼出了在同构并行机上的批在线调度问题,它是流程工业中MES的重要环节。
A dynamic scheduling algorithms studied in references are based on centralized grid system or part-distributed grid system, in which there are center node (s) to manage resources.
目前研究的动态任务调度算法都基于集中式或部分分布式网格系统,系统中心节点(组)进行资源管理。
Task scheduling is an important part in Grid computing. As it has been proven to be NP-complete, it is adaptive to be solved by heuristics.
在网格计算中,任务调度是一个重要的组成部分,并被证明为NP完全问题,以启发式方法求解较为适合。
Based on the analyses of a great number of related literatures, this paper was carefully analyzed the existing part of wireless sensor network operating system scheduling policies.
论文在分析了大量相关文献的基础上,对现有的部分无线传感网络操作系统的调度策略进行了分析。
In this paper a dynamic process model of part is built based on the scheduling and controlling for FMS.
提出一种基于FMS生产调度与控制的零件动态工艺模型。
The software part is consist of opening out PCI driver program, scheduling logic, the display interface of passive mode and the FM, CW, all-scene, fan-scene of active mode.
软件部分介绍了系统的PCI驱动程序开发方式,时序逻辑的实现,还有系统的被动显示界面、主动FM、CW、全景、扇面显示界面的设计。
Taxiway connects parking spot and runway, which takes an important part in airport surface scheduling.
滑行道连接停机位和跑道,是机场场面调度的重要关键环节。
Globl structure of real-time monitor and scheduling information system of water resource of Mianyang, composition and function of every part of the system are presented.
以绵阳市水资源实时监测调度系统为例,对水资源实时监测调度系统的总体结构、系统各部分的组成、功能作简要介绍。
Abstract: in this paper a dynamic process model of part is built based on the scheduling and controlling for FMS.
摘要提出一种基于FMS生产调度与控制的零件动态工艺模型。
The hard periodic task and soft aperiodic task are two basic types of real-time task; their hybrid scheduling is an important part of real-time research.
硬实时周期任务和软实时非周期任务是实时系统中两种基本的任务类型,它们的混合调度问题是实时研究的重点之一。
Next to improve the o (1) after the process scheduling scheduler data structure, time, and the calculation method of priority scheduling of analysis and study of the part.
其次对改进后的O(1)级进程调度的调度器的数据结构,时间片、优先级的计算方法,调度时机等部分的分析与研究。
The static scheduling algorithm, a part of hybrid model can schedule tasks with fault tolerant requirements together with those without fault tolerant requirements.
该算法能同时调度具有容错需求的实时任务和无容错需求的实时任务。
This research focuses on the integration of process planning and scheduling functions by using distributed expert systems, as the part of the main objective: establishment of CIM for shipbuilding.
研究应用分布式专家系统工具根据船舶设计信息产生造船生产流程的方法。
This research focuses on the integration of process planning and scheduling functions by using distributed expert systems, as the part of the main objective: establishment of CIM for shipbuilding.
研究应用分布式专家系统工具根据船舶设计信息产生造船生产流程的方法。
应用推荐