DCC: Part Number coding and maintenance principles.
料号编码原则制订及维护。
I posted about part Numbers, document number and numbering few times in the past.
过去曾屡次发表过零件编码、文档编码和编码方法之类的帖子。
This part number will be used for additional sample requests and production orders.
这部分号码将用于额外的要求和样品生产订单。
Or the Part number may be defined as a CAD property value , or simply a PLM autonumber .
或者物料号可能定义成一个CAD属性值,或者是一个简单的PLM自动编码。
An alphanumeric part number. This part number is unique and could suffice as the primary key.
字母数字零件号此零件号惟一并且可以用作主键。
The catalog service is used to find the part number, or SKU, of the item that is to be looked up.
catalog服务用于查找正在寻找的商品的编号或SKU。
Appendix b: Premium Actuated Valve Part Number Selection for configuration and accessory options.
请参阅附录B:高级执行机构阀门型号选型了解配置和附件备选件。
We created a script in Robot to test whether the part number field validation was functioning properly.
我们在Robot 中创建了一个测试脚本来测试数字域的验证是否示适当的。
Letter codes prepended to the part number are unique to the manufacturer, and are not industry-standard codes.
这部分数字中的字母代码对制造商来说是独一无二的,而不是行业标准的代码。
Are previous quality issues and customer complaints highlighted in inspection records for a given part number?
针对之前的品质问题和客户强烈抱怨的料号,是否有其检验记录?
If any accessories are being ordered, add the suffix, "A" to the end of the Actuated Valve Package part number.
如果订购任何附件,则在执行机构阀门组件包型号末端加上后缀“A”。
What is the scope covered by this audit? The entire foundry? A specific product line? A specific part number? Other?
这个审计覆盖的范围是什么?整个铸造?一个特定的产品行吗?一个特定的部分号码吗?其他的吗?
Tandem (Diverting) part number includes two valves operated from one actuator with one opening while the other closes.
串联(转向)型号包括两个阀门由一个执行器驱动,在一个关闭时另一个开启。
COMPLETE change: The process of making changes necessary to produce a new part number series. Also referred to as a set up.
完全改装:因为生产不同的产品系列而需要对机床进行必要的工序改变。
NPM : New Product to Manufacture, is a system used for production. It replaced part number tooling data release (PNTDR) system.
新产品制造:新产品制造是应用于生产的一套系统。 新产品制造代替了型号工装数据分配系统。
In any case, if the target Part number already exists, then the Assign function will simply link the Design to this existing Part.
无论如何,假如目标物料号已经存在,那么安排函数将会简单的链接设计到这个已经存在的物料。
Whenever possible, prior to placing your order, locate your motherboard part number (view example) and then order that exact number.
只要有可能,之前把您的订单,找到你的主板零件编号(查看例子)然后以便确切的数字。
A purchasing agent validates the line items on a paper request form, verifying that the part number and price matches the internal catalog.
采购代理商使用一张纸质申请表来确认采购项,确认部件编号和价钱匹配内部编目。
Finally, if your project system is pre-built by a manufacturer, search the Internet with the system's part number along with the keyword Linux.
最后,如果您的项目系统是由某家制造商预先构建的,则使用系统的部件号以及关键字linux来搜索Internet。
SET UP: Typically, the process of changing the tooling on a production machine tool in order to produce a different bearing component part number.
设置:改变或更换生产设备上的工装模具以生产不同型号轴承零件的过程。
The code below shows a PHP application that connects a Solr service, adds two documents to the index, and runs the part number query used previously.
下列代码显示了连接Solr服务、向索引中添加两个文档和运行先前使用的零部件号查询的PHP应用程序。
Because the partno field is declared unique, repeated upload operations of the same part number merely replace the old index record with a new record.
由于声明了partno字段惟一,因此重复上传同一个部件号将只用新记录替换旧索引记录。
The supplier shall prepare an itemized packing list bearing the order number, description of items, part number, and quantity shipped for each package.
供应商应准备载有订单号、细节描述、零件号、和每包运输的数量的详细装箱单。
Starting January 21st all authorize service centers have been receiving new earpiece models that have a slightly different color, but sport the same part number.
从1月21日所有授权服务中心已接收新耳机模式,有一个稍微不同的颜色,但相同的运动的一部分号码。
Here, though, there's a problem: a search for model and year must use the Assembly table, but the part number and part description can only be found in the Inventory table.
但这里存在一个问题:搜索型号和年份必须使用assembly表,但是零件号和零件描述只能在Inventory表中找到。
The approval for a specific part number is also valid for part numbers with higher dash numbers if the demands to personal qualification, tools and equipment are the same.
如果那些具有不同尾号的附件对于人员资格、工具设备的要求是相同的,那么对于其中某一个件号的批准同样适用于其它尾号的件号。
The Matrix shall represent all items (Description and Part Number) on the engineering "Bills of Material", required to build (component or assemble) the product at the plant.
矩阵应代表所有项目(名称及编号)对工程“的法案的材料” ,要求建设(组件或组装)的生产厂。
Product physical performance and part number is checked during First Article Inspection(FAI) and In-process Quality Check(IPQC), but the specified dimensions are not measured.
首件检查及制程检查有对产品的性能,元件料号进行确认,但对于指定的尺寸未有进行测量。
Product physical performance and part number is checked during First Article Inspection(FAI) and In-process Quality Check(IPQC), but the specified dimensions are not measured.
首件检查及制程检查有对产品的性能,元件料号进行确认,但对于指定的尺寸未有进行测量。
应用推荐