The port tugboat operation scheduling is a kind of parallel machines scheduling problem with special process constraint.
港口的拖轮调度过程是一类带特殊工艺约束的并行多机调度问题。
The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).
考虑并行批加工机上不同尺寸工件的调度问题;目标是极小化最大完工时间。
The problem of scheduling jobs with chain precedence constraints on identical parallel machines is discussed in this article.
所描述的问题为在平行机台上调度具有单一模具约束的成组工作,以实现最小化总拖期量为目标。
The problem of scheduling jobs with chain precedence constraints on identical parallel machines is discussed in this article.
所描述的问题为在平行机台上调度具有单一模具约束的成组工作,以实现最小化总拖期量为目标。
应用推荐