At a given air inlet condition and airflow rate, meanwhile, dryness of air outlet was required, proper heat-transfer area and matching refrigeration system are obtained through calculating.
在一定的进气状态下,为达到要求的出气干度,对给定的空气流量进行了设计计算,以得到合适的传热面积与制冷系统的匹配。
All requested item should be received bythe Outlet Manager. After check OSE condition and QTY the Outlet Manager and Stewardingshould be countersigned on internal transfer application form.
所有申请物品应由使用部门经理接收,确认物品完好及数量正确后,使用部门经理及管事部在借出记录表上签字。
All requested item should be received bythe Outlet Manager. After check OSE condition and QTY the Outlet Manager and Stewardingshould be countersigned on the loan & return form.
所有申请物品应由使用部门经理接收,确认物品完好及数量正确后,使用部门经理及管事部在借出或归还记录表上签字。
The boundary and initial condition, such as the inlet of the primary fluid and the secondary fluid, the outlet of the injector are given, and make the relevant numerical disposal.
给出了可调式引射器工作流体和引射流体入口、引射器出口的边界条件以及初始条件,并进行了相应的数值处理。
Uniform incoming fluid flowing velocity is set for entry of computation region and pressure boundary condition is inducted for outlet.
在计算区域的进口处给定均匀来流速度,在出口引入压力边界条件。
This paper proves that there is no instable flow in the bottom outlet works in Lijiaxia Hydroelectric station and the instable flow in the several models is caused by the modeling condition.
本文证实李家峡水电站左底孔不存在阵发性不稳定流态问题,模型上的这种不良流态是模拟条件引起的。
In the computation, the inlet of the primary flow uses the mass flowrate boundary condition. The inlet of the second flow and the outlet of the mixing flow use the pressure boundary condition.
在计算过程中,主流进口采用质量流量边界条件,二次流进口和混合流出口采用压力边界条件,均设置为环境大气压力。
This paper outlines the modification design for the structure of thermocouple at the outlet of cracker, the selection of sealing materials for new type thermocouple and the operation condition.
介绍裂解炉出口热电偶结构形式的设计改进、新结构形式热电偶密封材料的选择及生产运行。
Maintain the operation of the air-outlet system, including the air exhausting of bathroom and kitchen, as well as the condition of belt.
空调系统的送排风系统运行正常,包括卫生间、厨房的排风,皮带的松紧。
When the outlet coolant temperature or heat-transfer temperature difference is chosen, the acceptable mean residence time can be calculated by the second limiting condition.
在冷却介质出口温度或传热温差选定的情况下,可以由第二个条件计算满足热稳定性的平均停留时间。
In the direct numerical simulation of supersonic boundary layer flow, the outlet boundary condition will strongly effect the computational results.
在超声速边界层的计算中,出口处边界条件的好坏会影响计算结果。
Analyzed the height of the water outlet affects on the separating capability in the definite condition.
分析了在一定条件下,出水口高度对分离效果的影响。
Correctly identify the gas outlet temperature target of different coal will help the operator accurately determine and correctly handle the running condition according to the gas outlet temperature.
正确确定发生炉在气化不同煤种时的正常炉出煤气温度指标,有利于操作人员根据出煤气温度的变化,准确判断并正确处理炉况。
Hammer dust discharge valve will adjust the position of hammer according to actual condition of customers and guarantee outlet output and outlet frequency.
重锤卸灰阀根据客户实际工况需要调整重锤的位置来保证每次的下料量及下料频率。
Hammer dust discharge valve will adjust the position of hammer according to actual condition of customers and guarantee outlet output and outlet frequency.
重锤卸灰阀根据客户实际工况需要调整重锤的位置来保证每次的下料量及下料频率。
应用推荐