In order to carry out power transient tests for PWR fuel element in China Advanced research Reactor (carr), the research and conceptual design of 3he pressure control loop were completed.
为使中国先进研究堆(CARR)具备开展压水堆燃料瞬态试验的能力,本工作对氦- 3回路进行研究与初步设计。
In order to carry out power transient tests for PWR fuel element in China Advanced research Reactor (carr), the research and conceptual design of 3he pressure control loop were completed.
为使中国先进研究堆(CARR)具备开展压水堆燃料瞬态试验的能力,本工作对氦- 3回路进行研究与初步设计。
应用推荐