The method of cement slurry injection through big-shift directional drilling and its technological parameters used in Gaoyang Iron Ore Mine to seal underground water rushing are introduced.
详细介绍了高阳铁矿实施大位移定向钻孔注浆方法和工艺参数,其成功的经验对治理矿山井下突水淹井事故具有一定的参考价值。
The method of cement slurry injection through big-shift directional drilling and its technological parameters used in Gaoyang Iron Ore Mine to seal underground water rushing are introduced.
详细介绍了高阳铁矿实施大位移定向钻孔注浆方法和工艺参数,其成功的经验对治理矿山井下突水淹井事故具有一定的参考价值。
应用推荐