A brief description of section geological conditions, target, measures and results of ore blending is given.
本文介绍了区段地质简况,配矿目标、采取措施及取得的效果。
In order to reduce the cost, the iron and steel companies should optimize iron ore blending rate and transport route.
为了进一步降低采购成本,钢铁厂需对铁矿石配比和运输路线进行优化。
A new process called ore blending-KOH molten salt decomposition-water leaching was first put forward for the processing of a low-grade refractory tantalum-niobium ore.
首次提出采用“配矿-koh熔盐分解-水浸出”的新工艺来处理低品位、难分解钽铌矿。
In line with the features of accumulative bauxite ore, it is put forward and proved that it is an economically efficient way to solve the utilization of low grade accumulative bauxite by ore blending.
结合堆积型铝土矿的特点,提出并论证了通过配矿方式解决低品位堆积型铝土矿的利用问题是经济合理的办法。
According to the characteristics of the accumulated bauxite and the demands of production technology, the mathematical model for non-quantitative and quantitative ore blending in yard was constructed.
根据堆积型铝土矿矿体的特点,结合生产工艺技术的要求,构建堆积型铝土矿堆场的不定量与定量配矿的数学模型。
According to the characteristics of the accumulated bauxite and the demands of production technology, the mathematical model for non-quantitative and quantitative ore blending in yard was constructed.
根据堆积型铝土矿矿体的特点,结合生产工艺技术的要求,构建堆积型铝土矿堆场的不定量与定量配矿的数学模型。
应用推荐