• Expected yields with appropriate ranges should be established based on previous laboratory, pilot scale, or manufacturing data.

    具有合适范围预计收率应当根据以前的实验室中试规模生产数据确定

    youdao

  • The quantity of material or the percentage of theoretical yield anticipated at any appropriate phase of production based on previous laboratory, pilot scale, or manufacturing data.

    预期产量以前实验室中试规模生产数据基础上,预计任何适当生产阶段物料理论产量百分比

    youdao

  • Ensure cost data up to date with most recent engineering changes, manufacturing process definition, or economics assumption changes.

    确保成本数据的更新包含最新工程变更制造过程定义经济个体假设变化

    youdao

  • A process control alert occurs when a succession of data points shows an atypical pattern that was possibly caused by changes to the laboratory or manufacturing process.

    一连串数据显示可能实验室生产工艺变化引起了典型模式时,表示出现工艺控制警戒。

    youdao

  • A data collection component can record one or more manufacturing parameters of a product during a manufacture of the product.

    数据收集组件可以产品生产过程记录产品一个多个生产参数

    youdao

  • Fixed data shall be protected against erasure or alteration during the manufacturing process such that it cannot be modified or deleted by an outside entity.

    不可数据生产进行必须确保完好无损,也就是不能任何不相关的个人集体进行删改

    youdao

  • Fixed data shall be protected against erasure or alteration during the manufacturing process such that it cannot be modified or deleted by an outside entity.

    不可数据生产进行必须确保完好无损,也就是不能任何不相关的个人集体进行删改

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定